Effect of double track tunnel with small distance on existing tunnel deformation

P. Hu, Y. Teng, Meng Li, Liang Ma
{"title":"Effect of double track tunnel with small distance on existing tunnel deformation","authors":"P. Hu, Y. Teng, Meng Li, Liang Ma","doi":"10.1109/ICHCESWIDR54323.2021.9656286","DOIUrl":null,"url":null,"abstract":"MIDSA/ GTS software is used to simulate the double track parallel shield construction. The influence of double track shield construction on the existing tunnel under different small clear distance is studied, and the displacement and plastic zone development law of the existing tunnel are summarized. The analysis shows that the subsequent shield excavation will cause the clearance expansion and vault subsidence of the existing tunnel, and the uplift deformation of the inverted arch and the plastic zone of the surrounding rock of the tunnel will further become larger. When the clear distance is only 0. 8 times the tunnel diameter, reinforcement measures need to be taken.","PeriodicalId":425834,"journal":{"name":"2021 7th International Conference on Hydraulic and Civil Engineering & Smart Water Conservancy and Intelligent Disaster Reduction Forum (ICHCE & SWIDR)","volume":"104 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 7th International Conference on Hydraulic and Civil Engineering & Smart Water Conservancy and Intelligent Disaster Reduction Forum (ICHCE & SWIDR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHCESWIDR54323.2021.9656286","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

MIDSA/ GTS software is used to simulate the double track parallel shield construction. The influence of double track shield construction on the existing tunnel under different small clear distance is studied, and the displacement and plastic zone development law of the existing tunnel are summarized. The analysis shows that the subsequent shield excavation will cause the clearance expansion and vault subsidence of the existing tunnel, and the uplift deformation of the inverted arch and the plastic zone of the surrounding rock of the tunnel will further become larger. When the clear distance is only 0. 8 times the tunnel diameter, reinforcement measures need to be taken.
小间距双线隧道对既有隧道变形的影响
采用MIDSA/ GTS软件对双轨平行盾构结构进行仿真。研究了不同小净距下双线盾构施工对既有隧道的影响,总结了既有隧道的位移和塑性区发展规律。分析表明,后续盾构开挖将引起既有隧道的间隙扩大和拱顶沉降,仰拱的上拔变形和隧道围岩塑性区将进一步增大。当清晰距离仅为0时。8倍隧道直径,需采取加固措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信