{"title":"A failure model for distribution systems","authors":"G. Ledwich","doi":"10.1109/PES.2004.1373197","DOIUrl":null,"url":null,"abstract":"When distribution systems have multiple sources of supply for key loads there can be a significant increase in the overall reliability. For key systems a common design has been that no loss of supply should be experienced for any single contingency. This is referred to as N-1 reliability. When the peak load is only experienced for a short time there can be gains in capital expenditure from delaying investment in additional equipment even when peak loading is above N-1 levels. If the load dependence of subsequent failure is included in the analysis there can be a significant rise in the probability of cascading failure particularly if emergency loading levels are high. This analysis indicates that if leaving N-1 design safety careful analysis of the possibility of cascading failures can be critical.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
When distribution systems have multiple sources of supply for key loads there can be a significant increase in the overall reliability. For key systems a common design has been that no loss of supply should be experienced for any single contingency. This is referred to as N-1 reliability. When the peak load is only experienced for a short time there can be gains in capital expenditure from delaying investment in additional equipment even when peak loading is above N-1 levels. If the load dependence of subsequent failure is included in the analysis there can be a significant rise in the probability of cascading failure particularly if emergency loading levels are high. This analysis indicates that if leaving N-1 design safety careful analysis of the possibility of cascading failures can be critical.