Analysis system for real time management of congestions in bulk transmission systems

V. Nechataev, G. Krost, J. Vanzetta, M. Rogge
{"title":"Analysis system for real time management of congestions in bulk transmission systems","authors":"V. Nechataev, G. Krost, J. Vanzetta, M. Rogge","doi":"10.1109/CIGRE.2005.1532740","DOIUrl":null,"url":null,"abstract":"A tool was developed supporting transmission system operators (TSO) fast and in non-discriminatory manner in redistributing active power generation in cases of sudden and unexpected overload of lines or transformers. Despite of scrutinized generation schedules such situations might happen in cases of system failure or large uncertain (e.g., wind) power production. The system is based on SCADA information and delivers concrete and well measured suggestions to the operator, indicating the generation of which generators should be adjusted in order to remove the occurred overload, see principle sketch fig. 1, and is able to optionally account for generation displacement cost, too. It was developed in close cooperation of a university and a TSO in Germany and successfully verified on the basis of real bulk power system data","PeriodicalId":414346,"journal":{"name":"International Symposium CIGRE/IEEE PES, 2005.","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium CIGRE/IEEE PES, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIGRE.2005.1532740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A tool was developed supporting transmission system operators (TSO) fast and in non-discriminatory manner in redistributing active power generation in cases of sudden and unexpected overload of lines or transformers. Despite of scrutinized generation schedules such situations might happen in cases of system failure or large uncertain (e.g., wind) power production. The system is based on SCADA information and delivers concrete and well measured suggestions to the operator, indicating the generation of which generators should be adjusted in order to remove the occurred overload, see principle sketch fig. 1, and is able to optionally account for generation displacement cost, too. It was developed in close cooperation of a university and a TSO in Germany and successfully verified on the basis of real bulk power system data
大容量输电系统拥塞实时管理分析系统
开发了一种工具,支持输电系统运营商(TSO)在线路或变压器突然和意外过载的情况下,以快速和非歧视的方式重新分配有功发电。尽管有严格的发电计划,但这种情况可能发生在系统故障或大量不确定的情况下(例如,风力发电)。该系统基于SCADA信息,并向运营商提供具体且经过测量的建议,指示应调整哪些发电机的发电量以消除发生的过载,参见原理草图图1,并且还可以选择考虑发电位移成本。它是由德国一所大学和一家TSO密切合作开发的,并在实际大容量电力系统数据的基础上成功验证
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信