Providing Business Continuity Plan after Natural Disasters: a case stusy in the Staff Area of Water and Wastewater Company of Tehran

Vahid Shafaie, F. Darvish, M. Nazariha, S. Givehchi
{"title":"Providing Business Continuity Plan after Natural Disasters: a case stusy in the Staff Area of Water and Wastewater Company of Tehran","authors":"Vahid Shafaie, F. Darvish, M. Nazariha, S. Givehchi","doi":"10.18502/jder.v2i2.1515","DOIUrl":null,"url":null,"abstract":"Introduction: Each economic and non-economic institute is inevitably forced to pay special attention  to the post-crisis phase to keep its organizational alive, carry out its missions, and reduce the damages and costs caused by various crises. In this research, we tried to extract the Business Continuity Plan (BCP) after the natural disaster of earthquake in the staff area of Water and Wastewater Company of Tehran within the localized framework of BS-25999 British Standards Institution (BSI). \nMethod: In this regard, a questionnaire was used for data collection. Analysis of the questionnaire results was performed by SPSS19 and Expertchoice11 applications. \nResults: The manager of Water and Wastewater Company of  Tehran was found to be the best authority for managing the emergency so that the company can continue its operation and return to normal situation. According to the findings, the hot site was selected as the best location for business continuity of Water and Wastewater Company of Tehran, which could be an alternative site to continue the activities and services after the disaster. \nConclusion: A localized post-earthquake Business Continuity Plan (BCP) was suggested in the staff area of Water and Wastewater Company of Tehran. In this site,  necessary actions can be perfromed to continue the activities before, during, and after the disaster. Furthermore, organizational chart and task description can be redefined in it.","PeriodicalId":261201,"journal":{"name":"Journal of Disaster and Emergency Research","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Disaster and Emergency Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18502/jder.v2i2.1515","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Introduction: Each economic and non-economic institute is inevitably forced to pay special attention  to the post-crisis phase to keep its organizational alive, carry out its missions, and reduce the damages and costs caused by various crises. In this research, we tried to extract the Business Continuity Plan (BCP) after the natural disaster of earthquake in the staff area of Water and Wastewater Company of Tehran within the localized framework of BS-25999 British Standards Institution (BSI). Method: In this regard, a questionnaire was used for data collection. Analysis of the questionnaire results was performed by SPSS19 and Expertchoice11 applications. Results: The manager of Water and Wastewater Company of  Tehran was found to be the best authority for managing the emergency so that the company can continue its operation and return to normal situation. According to the findings, the hot site was selected as the best location for business continuity of Water and Wastewater Company of Tehran, which could be an alternative site to continue the activities and services after the disaster. Conclusion: A localized post-earthquake Business Continuity Plan (BCP) was suggested in the staff area of Water and Wastewater Company of Tehran. In this site,  necessary actions can be perfromed to continue the activities before, during, and after the disaster. Furthermore, organizational chart and task description can be redefined in it.
自然灾害后提供业务连续性计划:以德黑兰水务公司员工区为例
引言:每个经济和非经济机构都不可避免地被迫特别关注危机后阶段,以保持其组织的活力,执行其使命,并减少各种危机造成的损害和成本。在本研究中,我们试图在BS-25999英国标准协会(BSI)的本地化框架内提取德黑兰水务公司员工区地震自然灾害后的业务连续性计划(BCP)。方法:采用问卷调查法进行资料收集。采用SPSS19和Expertchoice11软件对问卷结果进行分析。结果:德黑兰自来水公司的管理者是处理突发事件的最佳权威,使该公司能够继续运营并恢复正常。根据调查结果,该热点地点被选为德黑兰水务公司业务连续性的最佳地点,可以作为灾后继续开展活动和服务的备选地点。结论:建议在德黑兰自来水公司员工区实施本地化的震后业务连续性计划(BCP)。在此站点中,可以执行必要的操作,以便在灾难发生之前、期间和之后继续进行活动。此外,它还可以重新定义组织结构图和任务描述。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信