Proposal to TPS delivery in 4 months?

R. Taylor
{"title":"Proposal to TPS delivery in 4 months?","authors":"R. Taylor","doi":"10.1109/AUTEST.2000.885590","DOIUrl":null,"url":null,"abstract":"Decreasing the often lengthy Test Program Set (TPS) development time is a high priority for both the DoD and the commercial industry. A protracted test development time for a commercial product can make or break its success. It can impact time-to-market goals for a product, which in turn can result in a loss of market share. Though the DoD world has different objectives, they too are concerned with long test development times which, can increase costs and jeopardize a weapon system's mission readiness. The case study for this paper is a test system developed by BAE SYSTEMS in less than four months to meet a commercial customer's stringent schedule requirements. The factors that contributed to the success of this project are examined, as is their relevance to the Doll world. The desire is to apply the relevant lessons learned from the commercial industry to DoD programs, yielding a decrease in TPS development time.","PeriodicalId":334061,"journal":{"name":"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.2000.885590","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Decreasing the often lengthy Test Program Set (TPS) development time is a high priority for both the DoD and the commercial industry. A protracted test development time for a commercial product can make or break its success. It can impact time-to-market goals for a product, which in turn can result in a loss of market share. Though the DoD world has different objectives, they too are concerned with long test development times which, can increase costs and jeopardize a weapon system's mission readiness. The case study for this paper is a test system developed by BAE SYSTEMS in less than four months to meet a commercial customer's stringent schedule requirements. The factors that contributed to the success of this project are examined, as is their relevance to the Doll world. The desire is to apply the relevant lessons learned from the commercial industry to DoD programs, yielding a decrease in TPS development time.
建议在4个月内交付TPS ?
减少通常冗长的测试程序集(TPS)开发时间是国防部和商业行业的当务之急。对于一个商业产品来说,延长测试开发时间可以决定它的成功与否。它会影响产品的上市时间目标,从而导致市场份额的损失。尽管国防部有不同的目标,但他们也关注测试开发时间过长,这会增加成本并危及武器系统的任务准备状态。本文的案例研究是由BAE系统公司在不到四个月的时间内开发的一个测试系统,以满足商业客户严格的进度要求。我们分析了促成该项目成功的因素,以及它们与《Doll》世界的相关性。希望将从商业工业中获得的相关经验应用到国防部项目中,从而减少TPS的开发时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信