{"title":"Environmental Issues and Challenges for Coal/Lignite based Thermal Power Plants and Mitigation Measures","authors":"S. Raghuthaman","doi":"10.18311/ijprvd/2022/30691","DOIUrl":null,"url":null,"abstract":"The world is undergoing a massive energy transition. Over the next decades, there will be radical changes in the way we produce and consume energy. The conventional energy infrastructure being set up now would be abandoned ever before their economic life is over. A quarter of India’s population have no access to electricity and our per capita consumption of electricity is very low at almost one third of world average with millions getting power a few hours a day. Surprisingly the plant load factor (PLF) for thermal power plant have steadily declined over the last four years and was only 63.6% in Sep. 2015. Breakthrough in solar plant technology posed a challenge for fossil fuel based thermal power plants. In April 2017, the tariff of utility connected large solar power projects in India hit a record low of Rs.3/kWh. This is the same as the average tariff of coal based power. At this tariff, solar plants are cheaper than a large number of new and old coal fired power plants in India.Stringent pollution norms add to the cost of generation of thermal power. Several projects in the power sector have become unviable on account of states like Andhra Pradesh, Uttar Pradesh and Karnataka have either cancelled the power purchase agreement or reworking on them. Few more states may follow in cancellation of power purchase agreement (PPA). Distribution Companies (DISCOMS) are reluctant to sign PPA because of high tariff, demand uncertainties, long duration of PPA and need to take the responsibility of fixed charges for the life of PPA. This will lead to creation of non-performing asset (NPA) worth Rs.1.5 lakh crores and to the extent the bank loans will be at risk.Some mitigation measures are suggested to meet the challenges in operation of coal/lignite based thermal power plants.","PeriodicalId":226140,"journal":{"name":"Indian Journal of Power and River Valley Development","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indian Journal of Power and River Valley Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18311/ijprvd/2022/30691","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The world is undergoing a massive energy transition. Over the next decades, there will be radical changes in the way we produce and consume energy. The conventional energy infrastructure being set up now would be abandoned ever before their economic life is over. A quarter of India’s population have no access to electricity and our per capita consumption of electricity is very low at almost one third of world average with millions getting power a few hours a day. Surprisingly the plant load factor (PLF) for thermal power plant have steadily declined over the last four years and was only 63.6% in Sep. 2015. Breakthrough in solar plant technology posed a challenge for fossil fuel based thermal power plants. In April 2017, the tariff of utility connected large solar power projects in India hit a record low of Rs.3/kWh. This is the same as the average tariff of coal based power. At this tariff, solar plants are cheaper than a large number of new and old coal fired power plants in India.Stringent pollution norms add to the cost of generation of thermal power. Several projects in the power sector have become unviable on account of states like Andhra Pradesh, Uttar Pradesh and Karnataka have either cancelled the power purchase agreement or reworking on them. Few more states may follow in cancellation of power purchase agreement (PPA). Distribution Companies (DISCOMS) are reluctant to sign PPA because of high tariff, demand uncertainties, long duration of PPA and need to take the responsibility of fixed charges for the life of PPA. This will lead to creation of non-performing asset (NPA) worth Rs.1.5 lakh crores and to the extent the bank loans will be at risk.Some mitigation measures are suggested to meet the challenges in operation of coal/lignite based thermal power plants.
煤/褐煤火力发电厂的环境问题和挑战及缓解措施
世界正在经历一场大规模的能源转型。在接下来的几十年里,我们生产和消费能源的方式将发生根本性的变化。现在正在建立的传统能源基础设施将在他们的经济生活结束之前被抛弃。印度有四分之一的人口用不上电,人均用电量很低,几乎是世界平均水平的三分之一,数百万人每天能用上几个小时的电。令人惊讶的是,火电厂的电厂负荷系数(PLF)在过去四年中稳步下降,2015年9月仅为63.6%。太阳能发电厂技术的突破对化石燃料火力发电厂提出了挑战。2017年4月,印度公用事业连接的大型太阳能发电项目的电价创下历史新低,为每千瓦时3卢比。这与燃煤发电的平均电价相同。按照这个电价,太阳能发电厂比印度大量新建和老旧的燃煤发电厂要便宜。严格的污染标准增加了火力发电的成本。由于安得拉邦、北方邦和卡纳塔克邦等邦取消了购电协议或对其进行重新设计,电力部门的几个项目已经变得不可持续。还有几个州可能会效仿取消购电协议(PPA)。由于电价高、需求不确定、PPA期限长,且需要承担PPA整个生命周期的固定费用,配电公司(DISCOMS)不愿签署PPA。这将导致不良资产(NPA)的产生,价值15万亿卢比,银行贷款将面临风险。针对煤/褐煤基火电厂在运行中遇到的问题,提出了相应的缓解措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信