{"title":"Scheduling predictive maintenance in flow-shop","authors":"C. Varnier, Noureddine Zerhouni","doi":"10.1109/PHM.2012.6228964","DOIUrl":null,"url":null,"abstract":"Availability of production equipments is one major issue for manufacturers. Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts could occur between maintenance and production if a maintenance operation is programmed when equipment is used for production. The case studied here is a flow-shop typology where machines could be maintained once during the planning horizon. Machines are able to switch between two production modes. A nominal one and a degraded one where machine run slowly but increase its remaining useful life. We propose a mixed integer programming model for this problem with the makespan and maintenance delays objective. It allows to find the best schedule of production operation. It also produces, for each machine, the control mode and if necessary the preventive maintenance plan.","PeriodicalId":444815,"journal":{"name":"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PHM.2012.6228964","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15

Abstract

Availability of production equipments is one major issue for manufacturers. Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts could occur between maintenance and production if a maintenance operation is programmed when equipment is used for production. The case studied here is a flow-shop typology where machines could be maintained once during the planning horizon. Machines are able to switch between two production modes. A nominal one and a degraded one where machine run slowly but increase its remaining useful life. We propose a mixed integer programming model for this problem with the makespan and maintenance delays objective. It allows to find the best schedule of production operation. It also produces, for each machine, the control mode and if necessary the preventive maintenance plan.
flow-shop中的预测性维护调度
生产设备的可用性是制造商面临的一个主要问题。预测性维护是一种解决方案,可以防止设备发生故障,同时最大限度地降低维护成本。然而,如果在设备用于生产时对维护操作进行了编程,则可能发生维护和生产之间的冲突。这里研究的案例是一个流水车间类型,其中机器可以在规划范围内维护一次。机器可以在两种生产方式之间切换。一种是名义上的,一种是退化的,机器运行缓慢,但增加了剩余的使用寿命。针对这一问题,提出了一个具有完工时间和维护延迟目标的混合整数规划模型。它允许找到生产操作的最佳时间表。它还为每台机器提供控制模式和必要时的预防性维护计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信