{"title":"A BSP approach to the scheduling of tightly-nested loops","authors":"R. Calinescu","doi":"10.1109/IPPS.1997.580954","DOIUrl":null,"url":null,"abstract":"This paper addresses the scheduling of uniform-dependence loop nests within the framework of the bulk-synchronous parallel (BSP) model. Two broad classes of tightly-nested loops are identified in the paper and scheduled according to the BSP discipline, and the resulting schedules are analysed in terms of the BSP cost model.","PeriodicalId":145892,"journal":{"name":"Proceedings 11th International Parallel Processing Symposium","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 11th International Parallel Processing Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPPS.1997.580954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8
Abstract
This paper addresses the scheduling of uniform-dependence loop nests within the framework of the bulk-synchronous parallel (BSP) model. Two broad classes of tightly-nested loops are identified in the paper and scheduled according to the BSP discipline, and the resulting schedules are analysed in terms of the BSP cost model.