{"title":"Concept of Half-Jacket and Retractable Joints to Restore Offshore Platform's Structural Integrity","authors":"P. Chatterjee, Jinesh Shah","doi":"10.2118/214028-ms","DOIUrl":null,"url":null,"abstract":"\n This paper presents a new approach of offshore jacket strengthening with rigidly connected members with minimum number of clamps and bolts. Horizontal and diagonal braces between two successive elevations of a jacket in a plane may be combined to form a prefabricated X-frame which will be able to replace a set of existing damaged members. To facilitate easy installation, X-frame will be assembled along with its connecting half-clamps and one side of the X-frame will be provided with retractable ends. The annulus portion of the movable ends of the X-frame will be grouted to make rigidly joined new braces. Additionally, the concept of half-jacket has been utilized to create additional deck space required for operational purpose. The half-jacket will be integrated to the existing structure by rigid subsea connections. The case study involves an aging offshore platform that undergoes a large amount of horizontal movement due to environmental loads. In spite of earlier upgrade with new piles and clamped braces, the substructure is found to be considerably flexible as a result of loose clamps and construction tolerance provided at the ends of each member. A detailed analytical study has been performed with the proposed strengthening scheme that shows significant improvement of the platform movement due to extreme environmental loads.","PeriodicalId":286390,"journal":{"name":"Day 1 Mon, March 13, 2023","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, March 13, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/214028-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper presents a new approach of offshore jacket strengthening with rigidly connected members with minimum number of clamps and bolts. Horizontal and diagonal braces between two successive elevations of a jacket in a plane may be combined to form a prefabricated X-frame which will be able to replace a set of existing damaged members. To facilitate easy installation, X-frame will be assembled along with its connecting half-clamps and one side of the X-frame will be provided with retractable ends. The annulus portion of the movable ends of the X-frame will be grouted to make rigidly joined new braces. Additionally, the concept of half-jacket has been utilized to create additional deck space required for operational purpose. The half-jacket will be integrated to the existing structure by rigid subsea connections. The case study involves an aging offshore platform that undergoes a large amount of horizontal movement due to environmental loads. In spite of earlier upgrade with new piles and clamped braces, the substructure is found to be considerably flexible as a result of loose clamps and construction tolerance provided at the ends of each member. A detailed analytical study has been performed with the proposed strengthening scheme that shows significant improvement of the platform movement due to extreme environmental loads.