J. Zhong, Yarong Chen, Jabir Mumtaz
{"title":"A Multi-Objective Scheduling Optimization Method for PCB Assembly Lines Based on the Improved Spider Monkey Algorithm","authors":"J. Zhong, Yarong Chen, Jabir Mumtaz","doi":"10.3390/engproc2022023015","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":319198,"journal":{"name":"ICAME-22","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ICAME-22","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/engproc2022023015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1