Risk Evaluation of Railway Business Line Construction Plan Based on Analytic Hierarchy Process and Bayesian Network

Xiaoxin Di, Xiangqian Li, L. Zhou, Wei Xiao, Y. Yue
{"title":"Risk Evaluation of Railway Business Line Construction Plan Based on Analytic Hierarchy Process and Bayesian Network","authors":"Xiaoxin Di, Xiangqian Li, L. Zhou, Wei Xiao, Y. Yue","doi":"10.1109/ICITE50838.2020.9231361","DOIUrl":null,"url":null,"abstract":"In order to improve the construction level of highspeed railway business lines, ensure the quality status of highspeed rail facilities, reduce the risk of business line construction, rational evaluating the business line construction plan risk is an urgent research. This paper combines Analytic Hierarchy Process (AHP) with Bayesian network(BN) and adapts AHP to determine the weight of each indicator; Based on BN theory, constructs a probabilistic model of business line construction risk evaluation and calculates the probability of different risk factors as low, medium and high risk. Finally takes the Beijing Railway Bureau's business line as an example to conduct a comprehensive evaluation, and concludes that the overall risk factor of the project is at a medium risk level, and the evaluation results are in good agreement with the actual site, therefore indicating that this evaluation method is more comprehensive exhaustive than the existing evaluation methods, it has certain practical significance for the railway site construction plan.)","PeriodicalId":112371,"journal":{"name":"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)","volume":"268 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITE50838.2020.9231361","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In order to improve the construction level of highspeed railway business lines, ensure the quality status of highspeed rail facilities, reduce the risk of business line construction, rational evaluating the business line construction plan risk is an urgent research. This paper combines Analytic Hierarchy Process (AHP) with Bayesian network(BN) and adapts AHP to determine the weight of each indicator; Based on BN theory, constructs a probabilistic model of business line construction risk evaluation and calculates the probability of different risk factors as low, medium and high risk. Finally takes the Beijing Railway Bureau's business line as an example to conduct a comprehensive evaluation, and concludes that the overall risk factor of the project is at a medium risk level, and the evaluation results are in good agreement with the actual site, therefore indicating that this evaluation method is more comprehensive exhaustive than the existing evaluation methods, it has certain practical significance for the railway site construction plan.)
基于层次分析法和贝叶斯网络的铁路业务线路建设计划风险评价
为了提高高铁业务线建设水平,保证高铁设施质量状态,降低业务线建设风险,合理评估业务线建设计划风险是一项迫切需要研究的课题。本文将层次分析法(AHP)与贝叶斯网络(BN)相结合,采用AHP确定各指标的权重;基于BN理论,构建了业务线建设风险评价的概率模型,计算出不同风险因素的低、中、高风险概率。最后以北京铁路局业务线为例进行综合评价,得出该项目整体风险因素处于中等风险水平,评价结果与现场实际吻合较好,说明该评价方法比现有评价方法更为全面详尽,对铁路场址建设规划具有一定的现实意义。)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信