{"title":"Bersimis II Powerkouse Plan Arrangement-Description of Apparatus","authors":"G. Ransom","doi":"10.1109/AIEEPAS.1962.4501383","DOIUrl":null,"url":null,"abstract":"A plant designer's view of an outdoor 850,000-hp (horsepower) hydroelectric plant in northeastern Quebec is presented. Twelve-foot spherical penstock valves have double seals. Steel scroll cases for the 171,000-hp turbines were completely assembled by welding in the field. Generators have self-lubricated bearings without oil lift for starting. Highspeed regulators provide for charging of long lines. A 6,000-amp (ampere) 15-kv isolated-phase bus is employed. Transformers step up to 300 kv. Control protection, station service, and accessory equipment are described.","PeriodicalId":118797,"journal":{"name":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1962-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AIEEPAS.1962.4501383","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A plant designer's view of an outdoor 850,000-hp (horsepower) hydroelectric plant in northeastern Quebec is presented. Twelve-foot spherical penstock valves have double seals. Steel scroll cases for the 171,000-hp turbines were completely assembled by welding in the field. Generators have self-lubricated bearings without oil lift for starting. Highspeed regulators provide for charging of long lines. A 6,000-amp (ampere) 15-kv isolated-phase bus is employed. Transformers step up to 300 kv. Control protection, station service, and accessory equipment are described.
Bersimis II电厂平面图布置-设备说明
魁北克东北部一座85万马力(马力)的室外水力发电厂的设计图。12英尺球形压力阀具有双重密封。171,000马力涡轮机的钢制涡旋壳体完全通过焊接在现场组装。发电机有自润滑轴承,起动时不需要举升油。高速调节器为长途线路提供充电。采用6,000安培(安培)15千伏隔离相母线。变压器升压至300千伏。介绍了控制保护、站点服务和附属设备。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信