{"title":"Planning and design","authors":"B. Spooner","doi":"10.4337/9781783471393.00025","DOIUrl":null,"url":null,"abstract":"The design of a tunnel involves relative to its cost the minimum of calculation and the maximum possible amount of consideration.","PeriodicalId":287707,"journal":{"name":"New Zealand Engineering","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1964-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"New Zealand Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4337/9781783471393.00025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
The design of a tunnel involves relative to its cost the minimum of calculation and the maximum possible amount of consideration.