Factors that Affect in Selecting the Most Appropriate Alternative Dispute Resolution Strategy for Construction Disputes

Amila N. K. K. Gamage
{"title":"Factors that Affect in Selecting the Most Appropriate Alternative Dispute Resolution Strategy for Construction Disputes","authors":"Amila N. K. K. Gamage","doi":"10.36348/sjce.2023.v07i04.001","DOIUrl":null,"url":null,"abstract":"Disputes are inevitable in construction projects, and cost and time impacts are higher on a project’s performance and successful completion. Therefore, it is essential to prevent disputes from arising or resolve them efficiently once arise. Other than litigation, Alternative Dispute Resolution (ADR) strategies receive more attention from organizations due to efficiency in dispute settlement. However, when using ADR strategies for dispute resolution, it is vital to select the most suitable technique based on the dispute type and other goals of disputant parties. Therefore, the objective of this study was to identify the factors that impact selecting the most appropriate alternative dispute resolution strategy for construction disputes. By analyzing existing research published from 2019 to 2023, this study revealed three main factor categories that influence ADR selection decisions. Those factor categories are financial factors, organizational factors, and legal factors. This study further identified research gaps that need attention in future research.","PeriodicalId":437137,"journal":{"name":"Saudi Journal of Civil Engineering","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Saudi Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36348/sjce.2023.v07i04.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Disputes are inevitable in construction projects, and cost and time impacts are higher on a project’s performance and successful completion. Therefore, it is essential to prevent disputes from arising or resolve them efficiently once arise. Other than litigation, Alternative Dispute Resolution (ADR) strategies receive more attention from organizations due to efficiency in dispute settlement. However, when using ADR strategies for dispute resolution, it is vital to select the most suitable technique based on the dispute type and other goals of disputant parties. Therefore, the objective of this study was to identify the factors that impact selecting the most appropriate alternative dispute resolution strategy for construction disputes. By analyzing existing research published from 2019 to 2023, this study revealed three main factor categories that influence ADR selection decisions. Those factor categories are financial factors, organizational factors, and legal factors. This study further identified research gaps that need attention in future research.
影响建筑纠纷替代性解决策略选择的因素
在建设项目中,纠纷是不可避免的,成本和时间对项目绩效和顺利完成的影响较大。因此,防止纠纷的发生或一旦发生纠纷,有效地解决纠纷是至关重要的。除诉讼外,替代性争议解决(ADR)策略因其解决纠纷的效率而受到组织的更多关注。然而,在使用ADR策略解决争议时,根据争议类型和当事人的其他目标选择最合适的技术是至关重要的。因此,本研究的目的是找出影响选择最合适的建筑纠纷替代解决策略的因素。通过分析2019年至2023年发表的现有研究,本研究揭示了影响ADR选择决策的三个主要因素类别。这些因素类别包括财务因素、组织因素和法律因素。本研究进一步发现了未来研究中需要注意的研究空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信