Project Scheduling Analysis With CPM PERT Method (Case Study on Tasikmalaya City Swasana Village Restaurant Project)

Delfi Santika, S. Lestari, Barin Barlian
{"title":"Project Scheduling Analysis With CPM PERT Method (Case Study on Tasikmalaya City Swasana Village Restaurant Project)","authors":"Delfi Santika, S. Lestari, Barin Barlian","doi":"10.53697/jim.v2i3.909","DOIUrl":null,"url":null,"abstract":"This study aims to determine the analysis of project scheduling using the Critical Path Method (CPM) Program Evaluation and Review Technique (PERT) method in the Tasikmalaya Swasana Village Restaurant project. The method used in this study is a qualitative descriptive method. By taking data on all activities and costs needed for the construction of a self-financing village restaurant. The data collected is in the form of primary data and secondary data. Data analysis in this study used POM for Windows QM Version 5. The results of the research from project scheduling using  the Critical Path Method (CPM) method can be completed for 29 weeks with a total cost needed of Rp. 1,606,633,852. while using the Program Evaluation and Review Technique (PERT) method which analyzes using three estimated times can find out the possibility that the project can be completed within 38 weeks with a success rate of 99% and the total cost that  it takes Rp. 1,606,633,852.","PeriodicalId":375257,"journal":{"name":"Journal of Indonesian Management (JIM)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Indonesian Management (JIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53697/jim.v2i3.909","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to determine the analysis of project scheduling using the Critical Path Method (CPM) Program Evaluation and Review Technique (PERT) method in the Tasikmalaya Swasana Village Restaurant project. The method used in this study is a qualitative descriptive method. By taking data on all activities and costs needed for the construction of a self-financing village restaurant. The data collected is in the form of primary data and secondary data. Data analysis in this study used POM for Windows QM Version 5. The results of the research from project scheduling using  the Critical Path Method (CPM) method can be completed for 29 weeks with a total cost needed of Rp. 1,606,633,852. while using the Program Evaluation and Review Technique (PERT) method which analyzes using three estimated times can find out the possibility that the project can be completed within 38 weeks with a success rate of 99% and the total cost that  it takes Rp. 1,606,633,852.
基于CPM PERT方法的项目进度分析(以Tasikmalaya市Swasana村餐厅项目为例)
本研究旨在以Tasikmalaya Swasana乡村餐厅项目为研究对象,运用关键路径法(CPM)、计划评估与审查技术(PERT)方法来确定项目进度分析。本研究采用的方法是定性描述法。通过收集建设一个自给自足的乡村餐馆所需的所有活动和费用的数据。所收集的数据分为一手数据和二次数据。本研究中的数据分析使用Windows QM Version 5的POM。使用关键路径法(CPM)方法进行项目调度的研究结果可以在29周内完成,总成本为1,606,633,852卢比。而使用计划评估和审查技术(PERT)方法,使用三个估计时间进行分析,可以发现项目可以在38周内完成的可能性,成功率为99%,总成本为1,606,633,852卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信