{"title":"Using outage data to improve reliability","authors":"J. Burke","doi":"10.1109/67.831431","DOIUrl":null,"url":null,"abstract":"This paper illustrates how an electric utility can use a sophisticated outage management system (OMS) to improve power system performance by: establishing accurate failure rates and outage times; identifying specific areas that contribute to poor system reliability indexes; using actual data to improve the accuracy of predictive reliability studies; and establishing system performance without the use of costly monitoring systems.","PeriodicalId":435675,"journal":{"name":"IEEE Computer Applications in Power","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Computer Applications in Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/67.831431","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16
Abstract
This paper illustrates how an electric utility can use a sophisticated outage management system (OMS) to improve power system performance by: establishing accurate failure rates and outage times; identifying specific areas that contribute to poor system reliability indexes; using actual data to improve the accuracy of predictive reliability studies; and establishing system performance without the use of costly monitoring systems.