Study about the price limit of RES orders

P. Barta, D. Divényi
{"title":"Study about the price limit of RES orders","authors":"P. Barta, D. Divényi","doi":"10.1109/IYCE45807.2019.8991557","DOIUrl":null,"url":null,"abstract":"Supporting renewable energy sources is currently a widely discussed issue. To ensure the pay-off from the application of renewable energy technologies in Hungary, a feed-in-tariff supporting system has been created applying obligatory offtake. It means that the Hungarian TSO has to buy the energy from the producer at a definite price. TSO sells the energy on the day-ahead market and on the intraday market, but this paper focuses only the day-ahead. In general the market clearing price (MCP) is lower than this definite price so the TSO sells the energy at a loss. According to governmental regulations the TSO must be neither profitable nor loss-making so this deficit is allocated to the industrial customers. Limit price is one of the many regulations pertaining to the trading the Hungarian Power Exchange (HUPX DAM) meaning the energy cannot be sold when the MCP is lower than the limit price. If the energy cannot be sold, the TSO will face with high balancing costs. The aim of this paper is to find a way to minimize balancing costs and the amount of balancing energy, either by the modification the limit price or by giving a price-taker offer. Although the KAT system was discontinued on 31 December 2016, the contracted producers still remained within the framework. The authority approved 2000 MW capacity to build in, giving actuality to the topic.","PeriodicalId":226881,"journal":{"name":"2019 7th International Youth Conference on Energy (IYCE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 7th International Youth Conference on Energy (IYCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IYCE45807.2019.8991557","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Supporting renewable energy sources is currently a widely discussed issue. To ensure the pay-off from the application of renewable energy technologies in Hungary, a feed-in-tariff supporting system has been created applying obligatory offtake. It means that the Hungarian TSO has to buy the energy from the producer at a definite price. TSO sells the energy on the day-ahead market and on the intraday market, but this paper focuses only the day-ahead. In general the market clearing price (MCP) is lower than this definite price so the TSO sells the energy at a loss. According to governmental regulations the TSO must be neither profitable nor loss-making so this deficit is allocated to the industrial customers. Limit price is one of the many regulations pertaining to the trading the Hungarian Power Exchange (HUPX DAM) meaning the energy cannot be sold when the MCP is lower than the limit price. If the energy cannot be sold, the TSO will face with high balancing costs. The aim of this paper is to find a way to minimize balancing costs and the amount of balancing energy, either by the modification the limit price or by giving a price-taker offer. Although the KAT system was discontinued on 31 December 2016, the contracted producers still remained within the framework. The authority approved 2000 MW capacity to build in, giving actuality to the topic.
研究RES订单的价格限制
支持可再生能源是目前广泛讨论的问题。为了确保可再生能源技术在匈牙利的应用获得回报,已经建立了一个上网电价支持系统,适用强制性承购。这意味着匈牙利TSO必须以确定的价格从生产商那里购买能源。TSO在日前市场和日内市场上出售能源,但本文只关注于日前市场。一般情况下,市场出清价格(MCP)低于这一确定价格,因此TSO亏本出售能源。根据政府规定,TSO必须既不盈利也不亏损,因此这一赤字被分配给工业客户。限价是与匈牙利电力交易所(HUPX DAM)交易有关的众多规定之一,这意味着当MCP低于限价时,能源不能出售。如果能源卖不出去,TSO将面临高额的平衡成本。本文的目的是通过修改限价或给出价格接受者报价来寻找一种最小化平衡成本和平衡能量的方法。尽管KAT系统于2016年12月31日停产,但合同生产商仍在该框架内。当局批准了2000兆瓦容量的建设,使该主题成为现实。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信