{"title":"Design of a Lagrangian relaxation-based hierarchical production scheduling environment for semiconductor wafer fabrication","authors":"T.-K. Hwang, Shi-Chung Chang","doi":"10.1109/TRA.2003.814512","DOIUrl":null,"url":null,"abstract":"This paper describes the design of a two-level hierarchical production scheduling engine, which captures the industrial practice of mass production semiconductor fabrication factories (fabs). The two levels of the hierarchy consist of a mid-term scheduler and a short-term scheduler, and are aimed at achieving coordination between the fab-wide objectives and local shop-floor operations. The mid-term scheduler maximizes weighted production flow to reduce the fab-wide cycle time and ensure on-time delivery by properly setting daily production target volumes and reference work-in-process (WIP) levels for individual part types and stages. Mid-term scheduling results are further broken down into more detailed schedules by the short-term scheduler. In addition to the same set of operational constraints in mid-term scheduling, the short-term scheduler includes the consideration of batching effects. It maximizes weighted production flow while tracking the daily production targets and the reference WIP levels specified by mid-term scheduling. The schedulers adopt a solution methodology with three ingredients; the Lagrange relaxation approach, network flow optimization, and Frank-Wolfe method. The scheduling tool is reasonably efficient in computation.","PeriodicalId":161449,"journal":{"name":"IEEE Trans. Robotics Autom.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2003-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"37","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Trans. Robotics Autom.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TRA.2003.814512","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 37
Abstract
This paper describes the design of a two-level hierarchical production scheduling engine, which captures the industrial practice of mass production semiconductor fabrication factories (fabs). The two levels of the hierarchy consist of a mid-term scheduler and a short-term scheduler, and are aimed at achieving coordination between the fab-wide objectives and local shop-floor operations. The mid-term scheduler maximizes weighted production flow to reduce the fab-wide cycle time and ensure on-time delivery by properly setting daily production target volumes and reference work-in-process (WIP) levels for individual part types and stages. Mid-term scheduling results are further broken down into more detailed schedules by the short-term scheduler. In addition to the same set of operational constraints in mid-term scheduling, the short-term scheduler includes the consideration of batching effects. It maximizes weighted production flow while tracking the daily production targets and the reference WIP levels specified by mid-term scheduling. The schedulers adopt a solution methodology with three ingredients; the Lagrange relaxation approach, network flow optimization, and Frank-Wolfe method. The scheduling tool is reasonably efficient in computation.