A Determination of PV and Wind Power Plant Penetration into a Power System

M. A. Rosyied, S. Sarjiya, L. M. Putranto, Izzuddin Fathin Azhar, Eko Yudo Pramono
{"title":"A Determination of PV and Wind Power Plant Penetration into a Power System","authors":"M. A. Rosyied, S. Sarjiya, L. M. Putranto, Izzuddin Fathin Azhar, Eko Yudo Pramono","doi":"10.46962/FORTEIJEERI.V1I1.5","DOIUrl":null,"url":null,"abstract":"PT. PLN (Persero) has planned to develop a new renewable energy which has a minimum energy mix of 23% in 2025 and 31% in 2030. An intermittent renewable energy plant, which is uncontrollable and unpredictable, will begin to be massively used. Associated to the intermittent nature of the of intermittent renewable energy source (IRES), adequate system flexibility is necessary. This study determined the penetration level IRES generating unit using the systems load and existing generating unit ramping rate characteristic, IRES generating unit’s ramping rate and system’s technical minimum load (TML) on the Java Bali System based on the 2017 operation condition. The results showed that the TML value of the operating plant was 12164,69 MW. The ramping up and down capabilities of conventional power plants are 945.04 MW / 30 min and 4006.08 MW / 30 min where ± 5% of penetration of IRES was still applicable for the Java Bali System.","PeriodicalId":175469,"journal":{"name":"Journal FORTEI-JEERI","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal FORTEI-JEERI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46962/FORTEIJEERI.V1I1.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

PT. PLN (Persero) has planned to develop a new renewable energy which has a minimum energy mix of 23% in 2025 and 31% in 2030. An intermittent renewable energy plant, which is uncontrollable and unpredictable, will begin to be massively used. Associated to the intermittent nature of the of intermittent renewable energy source (IRES), adequate system flexibility is necessary. This study determined the penetration level IRES generating unit using the systems load and existing generating unit ramping rate characteristic, IRES generating unit’s ramping rate and system’s technical minimum load (TML) on the Java Bali System based on the 2017 operation condition. The results showed that the TML value of the operating plant was 12164,69 MW. The ramping up and down capabilities of conventional power plants are 945.04 MW / 30 min and 4006.08 MW / 30 min where ± 5% of penetration of IRES was still applicable for the Java Bali System.
光伏和风力发电厂进入电力系统的确定
PT. PLN (Persero)计划开发一种新的可再生能源,2025年的最低能源结构为23%,2030年为31%。一种不可控、不可预测的间歇式可再生能源将开始大规模使用。与间歇性可再生能源(IRES)的间歇性有关,足够的系统灵活性是必要的。本研究基于2017年运行工况,利用系统负荷和现有发电机组爬坡率特征、IRES发电机组爬坡率和系统技术最小负荷(TML)确定了Java Bali系统上IRES发电机组的渗透水平。结果表明,运行装置的TML值为12164,69 MW。传统电厂的升压能力为945.04 MW / 30 min和4006.08 MW / 30 min,其中±5%的IRES渗透仍然适用于Java Bali系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信