Placing the Elements and Structural Assemblies of Electrical Equipment of an UAV

R. Nizamov, E. Fedorov, A. Ferenets
{"title":"Placing the Elements and Structural Assemblies of Electrical Equipment of an UAV","authors":"R. Nizamov, E. Fedorov, A. Ferenets","doi":"10.1109/FAREASTCON.2018.8602736","DOIUrl":null,"url":null,"abstract":"The process of designing a vehicle power supply system consists of solving many problems. The basis of the design stage is development of schematic diagrams. The main labor input is the task of determining the spatial position of the elements, their connections and preparation of corresponding technical documentation: tables of connections, specifications, etc. Such problems represent a class of topological design problems. When designing the interblock assembling, they are corresponded to the sequence of performing the tasks of layout and placement of structural assemblies, wiring of electrical circuits, forming and tracing the bunched cables. In this article, we will consider the problem of the placement of structural assemblies and wiring of electrical circuits.","PeriodicalId":177690,"journal":{"name":"2018 International Multi-Conference on Industrial Engineering and Modern Technologies (FarEastCon)","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Multi-Conference on Industrial Engineering and Modern Technologies (FarEastCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FAREASTCON.2018.8602736","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

The process of designing a vehicle power supply system consists of solving many problems. The basis of the design stage is development of schematic diagrams. The main labor input is the task of determining the spatial position of the elements, their connections and preparation of corresponding technical documentation: tables of connections, specifications, etc. Such problems represent a class of topological design problems. When designing the interblock assembling, they are corresponded to the sequence of performing the tasks of layout and placement of structural assemblies, wiring of electrical circuits, forming and tracing the bunched cables. In this article, we will consider the problem of the placement of structural assemblies and wiring of electrical circuits.
无人机电气设备元件和结构组件的放置
汽车供电系统的设计过程包括解决许多问题。设计阶段的基础是原理图的开发。主要的劳动投入是确定元件的空间位置、它们之间的连接以及准备相应的技术文件:连接表、规范等。这类问题代表了一类拓扑设计问题。在设计块间装配时,它们对应于执行结构组件的布置和放置、电路的布线、成束电缆的形成和跟踪等任务的顺序。在本文中,我们将考虑结构组件的放置和电路的布线问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信