Integrated Solution for Geological Modeling of Deposits. From Interpretation of Seismic to Structural Modeling With the Possibility of Estimating Uncertainties
{"title":"Integrated Solution for Geological Modeling of Deposits. From Interpretation of Seismic to Structural Modeling With the Possibility of Estimating Uncertainties","authors":"E. Volk, M. Safronov","doi":"10.3997/2214-4609.201802057","DOIUrl":null,"url":null,"abstract":"Summary The integrated solution implemented within a single interface and database has a set of innovative technologies for a full cycle of geological modeling, , from seismic interpretation to calculation of reserves, including on multivariate models, taking into account given uncertainties and risks. The approach is based on the modeling graph - Workflow used to automate the process of modeling, updating and calculating the set of model realizations. The workflow is appropriate for the evaluation of significant contingent resources and for the reliable quantification of commercial reserves. It is also suitable for providing input to development plans and concept design choices, and for management of fields in early phases of production.","PeriodicalId":253414,"journal":{"name":"GeoBaikal 2018","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"GeoBaikal 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201802057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Summary The integrated solution implemented within a single interface and database has a set of innovative technologies for a full cycle of geological modeling, , from seismic interpretation to calculation of reserves, including on multivariate models, taking into account given uncertainties and risks. The approach is based on the modeling graph - Workflow used to automate the process of modeling, updating and calculating the set of model realizations. The workflow is appropriate for the evaluation of significant contingent resources and for the reliable quantification of commercial reserves. It is also suitable for providing input to development plans and concept design choices, and for management of fields in early phases of production.