Comparison of Three Methodologies for Quasi-2D River Flood Modeling with SWMM5

J. Beck
{"title":"Comparison of Three Methodologies for Quasi-2D River Flood Modeling with SWMM5","authors":"J. Beck","doi":"10.14796/JWMM.C402","DOIUrl":null,"url":null,"abstract":"Three methods for quasi-2D model setup of a SWMM5 project are explored with the PCSWMM 5.6 software using real project data from a hydraulic study of the Birse…","PeriodicalId":118832,"journal":{"name":"The Journal of Water Management Modeling","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Water Management Modeling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14796/JWMM.C402","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Three methods for quasi-2D model setup of a SWMM5 project are explored with the PCSWMM 5.6 software using real project data from a hydraulic study of the Birse…
三种方法在SWMM5准二维河流洪水模拟中的比较
采用PCSWMM 5.6软件,利用Birse盆地水力研究的实际项目数据,探讨了三种建立SWMM5项目准二维模型的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信