High-speed rail and barriers to innovation: The Budd Company and the limits of US indirect industrial policy in the 1960s and 1970s

Jonathan Michael Feldman
{"title":"High-speed rail and barriers to innovation: The Budd Company and the limits of US indirect industrial policy in the 1960s and 1970s","authors":"Jonathan Michael Feldman","doi":"10.1177/00225266221080407","DOIUrl":null,"url":null,"abstract":"This study examines the Metroliner passenger rail trains manufactured by the Budd Company in the 1960s and 1970s. I show that while transportation companies and the government facilitated the development of a high(er) speed rail line and trains, this procurement process was not sufficient for sustaining Budd as a national rail producer. This case study is based on government documents, interviews, news reports, published studies and archival work. The limits to the Metroliner program as industrial policy were based on: (a) company innovative lags; (b) weakness in Budd's industrial profile and endogenous capacities; (c) failures in systems integration and (d) the contradictions of an indirect industrial policy, where companies gain capacities from the state indirectly or insufficiently.","PeriodicalId":336494,"journal":{"name":"The Journal of Transport History","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Transport History","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/00225266221080407","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study examines the Metroliner passenger rail trains manufactured by the Budd Company in the 1960s and 1970s. I show that while transportation companies and the government facilitated the development of a high(er) speed rail line and trains, this procurement process was not sufficient for sustaining Budd as a national rail producer. This case study is based on government documents, interviews, news reports, published studies and archival work. The limits to the Metroliner program as industrial policy were based on: (a) company innovative lags; (b) weakness in Budd's industrial profile and endogenous capacities; (c) failures in systems integration and (d) the contradictions of an indirect industrial policy, where companies gain capacities from the state indirectly or insufficiently.
高铁与创新障碍:巴德公司与上世纪六七十年代美国间接产业政策的局限性
本研究考察了Budd公司在20世纪60年代和70年代制造的Metroliner客运列车。我指出,虽然运输公司和政府促进了高速铁路线和列车的发展,但这种采购过程不足以维持Budd作为国家铁路生产商的地位。本案例研究基于政府文件、访谈、新闻报道、已发表的研究和档案工作。地铁列车计划作为产业政策的局限性是基于:(a)公司创新滞后;(b) Budd的工业概况和内生能力薄弱;(c)系统集成的失败和(d)间接产业政策的矛盾,公司间接或不充分地从国家获得能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信