Y. T. Mohamed
{"title":"Quality assurance program for spent radioactive sealed sources in Egypt","authors":"Y. T. Mohamed","doi":"10.1002/QAJ.444","DOIUrl":null,"url":null,"abstract":"Effective implementation of the Hot Laboratories Center Quality Assurance Program (QAP) is dependent on the efforts at all levels of all participants. Management is responsible for defining quality, developing appropriate plans to attain quality, and supporting the workers in the pursuit of quality. QA organizations of the program participants are responsible for verifying the achievement of quality in the implementation of the Hot Laboratories Center QA program. A written QAP shall be developed, implemented, and maintained. The QAP describes the organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the work. The QAP shall describe the management processes, including planning, scheduling, and resource considerations. The organization, responsibilities/authorities of all participants, internal and external interfaces, and lines of communication should be established during the conceptual phase. Quality Assurance (QA) as an essential management tool is being strongly applied in the area of predisposal of Spent Radioactive Sealed Sources (SRSS). Quality Control is now considered as part of the planning and systematic actions of QA. To ensure compliance with the requirements, and to assure the envisaged behavior of the SRSS package and disposal system, a QAP for all stages of SRSS management, including SRSS conditioning, transportation, storage, and disposal are required. Copyright © 2009 John Wiley & Sons, Ltd.","PeriodicalId":147931,"journal":{"name":"Quality Assurance Journal","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Assurance Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/QAJ.444","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
埃及废放射性密封源的质量保证计划
热实验室中心质量保证计划(QAP)的有效实施依赖于所有参与者在各个层面的努力。管理层负责定义质量,制定适当的计划以达到质量,并支持员工追求质量。项目参与者的质量保证组织负责验证热实验室中心质量保证计划实施的质量成就。应制定、实施和保持书面的质量保证程序(QAP)。QAP描述了管理、执行和评估工作的组织结构、功能职责、权限级别和接口。质量保证程序(QAP)应描述管理过程,包括计划、调度和资源考虑。应在概念阶段确定所有参与者的组织、职责/权限、内部和外部接口以及通信线路。质量保证作为一项重要的管理工具,正在废放射性密封源的预处置领域得到大力应用。质量控制现在被认为是QA计划和系统行动的一部分。为确保符合要求,并确保SRSS包装和处置系统的预期行为,SRSS管理的所有阶段,包括SRSS调节,运输,储存和处置,都需要一个QAP。版权所有©2009 John Wiley & Sons, Ltd
本文章由计算机程序翻译,如有差异,请以英文原文为准。