Dynamic evaluation of costs in combined wired and wireless LAN

A. Luntovskyy, V. Vasyutynskyy, K. Kabitzsch
{"title":"Dynamic evaluation of costs in combined wired and wireless LAN","authors":"A. Luntovskyy, V. Vasyutynskyy, K. Kabitzsch","doi":"10.1109/WFCS.2008.4638709","DOIUrl":null,"url":null,"abstract":"Evaluation and prediction of the overall costs for installation and upgrade of combined wired and wireless LAN under consideration of the time factor are presented in this paper. Advanced dynamic costs models under considering of different QoS requirements are investigated. These models allow more exact prediction of network costs at some time moment in the future. The determining of cost model parameters is discussed. The network costs optimization approaches are used to define the necessary capital expenditures in the time moment of network upgrade.","PeriodicalId":352963,"journal":{"name":"2008 IEEE International Workshop on Factory Communication Systems","volume":"254 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE International Workshop on Factory Communication Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WFCS.2008.4638709","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Evaluation and prediction of the overall costs for installation and upgrade of combined wired and wireless LAN under consideration of the time factor are presented in this paper. Advanced dynamic costs models under considering of different QoS requirements are investigated. These models allow more exact prediction of network costs at some time moment in the future. The determining of cost model parameters is discussed. The network costs optimization approaches are used to define the necessary capital expenditures in the time moment of network upgrade.
有线与无线组合局域网中成本的动态评估
本文对考虑时间因素的有线与无线组合局域网的安装与升级总成本进行了评估与预测。研究了考虑不同QoS要求的高级动态成本模型。这些模型可以更准确地预测未来某一时刻的网络成本。讨论了成本模型参数的确定。利用网络成本优化方法确定网络升级时的必要资本支出。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信