Evaluation on the TBM Performance at a Hydropower Project in Ecuador

K. K. Panthi, J. Encalada
{"title":"Evaluation on the TBM Performance at a Hydropower Project in Ecuador","authors":"K. K. Panthi, J. Encalada","doi":"10.3126/HN.V24I0.23575","DOIUrl":null,"url":null,"abstract":"The aim of this manuscript is to discuss the Tunnel Boring Machine (TBM) performance along the recently constructed headrace tunnel of Minas-San Francisco Hydropower Project in Ecuador. Firstly, the manuscript briefly describes the importance of TBM tunneling and about the Minas-San HPP. Further, discussions are made on the engineering geological conditions along the headrace tunnel. Detailed evaluations are made on the performance of TBM tunneling considering influence of rock mass quality on the TBM penetration rate. The manuscript emphasizes that the knowledge of the rock mass quality parameters and cutter technology available at present are among the key factors that influence the estimation of the net penetration rate of the TBM. It has been demonstrated that the hard to very hard rock masses of high abrasivity that were encountered along the headrace tunnel alignment caused very low penetration giving slow progress, which was not predicted during planning phase design. The authors investigated a fairly good link between TBM penetration and the mechanical strength of the rock mass.","PeriodicalId":137822,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V24I0.23575","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The aim of this manuscript is to discuss the Tunnel Boring Machine (TBM) performance along the recently constructed headrace tunnel of Minas-San Francisco Hydropower Project in Ecuador. Firstly, the manuscript briefly describes the importance of TBM tunneling and about the Minas-San HPP. Further, discussions are made on the engineering geological conditions along the headrace tunnel. Detailed evaluations are made on the performance of TBM tunneling considering influence of rock mass quality on the TBM penetration rate. The manuscript emphasizes that the knowledge of the rock mass quality parameters and cutter technology available at present are among the key factors that influence the estimation of the net penetration rate of the TBM. It has been demonstrated that the hard to very hard rock masses of high abrasivity that were encountered along the headrace tunnel alignment caused very low penetration giving slow progress, which was not predicted during planning phase design. The authors investigated a fairly good link between TBM penetration and the mechanical strength of the rock mass.
厄瓜多尔某水电工程TBM性能评价
本文的目的是讨论隧道掘进机(TBM)沿最近在厄瓜多尔米纳斯-旧金山水电工程的引水隧道的性能。本文首先简要介绍了隧道掘进机掘进的重要性和米纳斯-桑水电站的情况。并对引水隧洞沿线的工程地质条件进行了探讨。考虑岩体质量对隧道掘进机掘进速度的影响,对隧道掘进性能进行了详细评价。文章强调,目前对岩体质量参数的了解和刀具技术是影响TBM净突速估算的关键因素之一。研究表明,沿引水隧洞走向所遇到的高磨蚀性的硬岩体至极硬岩体,导致侵彻量极低,进度缓慢,这是规划阶段设计时没有预料到的。作者研究了TBM穿深与岩体机械强度之间的良好联系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信