{"title":"INTEGRATED WORKFLOW MODELLING FOR SHORT-TERM PRODUCTION PLANNING SYSTEMS","authors":"A. Tjoa, Roland Wagner, Christian Gierlinger","doi":"10.1615/faim1994.280","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":309030,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1994","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of Flexible Automation and Integrated Manufacturing 1994","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1615/faim1994.280","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}