{"title":"Development of Financial Model to Solarize Public Institutes in Pakistan","authors":"A. Hafeez, Waqas Ali Khan, Muhammad Abdur Rahman","doi":"10.1109/ICECE51984.2021.9406291","DOIUrl":null,"url":null,"abstract":"Punjab is the largest province of Pakistan, constituting 53% of its population. Due to a rapidly growing load demand at 10% per year, Punjab is currently facing a substantial demand-supply gap of 5,000MWs. With two-third of the entire consumption of total generated power in Pakistan, Punjab is worst affected by the shortfall, economic and social consequences resulting from electrical load shedding. Inefficient energy industrial processes, building designs and electricity usage by consumers drives up overall and peak demand and impose great stress on the available energy supply. Acknowledging the issue, the provincial government of Punjab established the Punjab Energy Conservation and Energy Efficiency Agency (PEECA) in 2015, to promote, develop and implement energy efficiency (EE) projects and policies at the provincial level. To continue widening the scope and increase the scale of Energy Efficiency projects in Punjab, other than direct funding from the Government, monetary investment from other entities such as state enterprise and private investors is instrumental. However, various challenges exist in attracting private investors to invest in EE related projects. In order to have a complete understanding of the challenges involved, questionnaires were issued to various stakeholders such as Multi-Laterals, Power Distribution Companies (DISCOs) and Energy Service Companies (ESCOs) in consultation with the client (PEECA). From the responses, regulatory issues, bureaucratic delays and lack of awareness of EE among the investors and community were some of the factors highlighted. Considering the issue from a holistic perspective, the team reviewed various investment models in the energy efficiency sector from the developing and developed world and proposed two refined investment models, taking into account the factors highlighted in the questionnaire and addressing the political, social and environmental issues involved. The team believes that the policy proposal will help PEECA manage the demand side of electricity more effectively and help reduce the consumption of fossil fuels, and GHG emissions. This will encourage the people of Punjab to live within the finite resources of earth and act as a form of stewardship towards future generations. It will further improve the lives of millions since climate change is the cause of frequent floods in Pakistan and damages are caused due to this calamity.","PeriodicalId":374012,"journal":{"name":"2021 4th International Conference on Energy Conservation and Efficiency (ICECE)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Conference on Energy Conservation and Efficiency (ICECE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICECE51984.2021.9406291","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Punjab is the largest province of Pakistan, constituting 53% of its population. Due to a rapidly growing load demand at 10% per year, Punjab is currently facing a substantial demand-supply gap of 5,000MWs. With two-third of the entire consumption of total generated power in Pakistan, Punjab is worst affected by the shortfall, economic and social consequences resulting from electrical load shedding. Inefficient energy industrial processes, building designs and electricity usage by consumers drives up overall and peak demand and impose great stress on the available energy supply. Acknowledging the issue, the provincial government of Punjab established the Punjab Energy Conservation and Energy Efficiency Agency (PEECA) in 2015, to promote, develop and implement energy efficiency (EE) projects and policies at the provincial level. To continue widening the scope and increase the scale of Energy Efficiency projects in Punjab, other than direct funding from the Government, monetary investment from other entities such as state enterprise and private investors is instrumental. However, various challenges exist in attracting private investors to invest in EE related projects. In order to have a complete understanding of the challenges involved, questionnaires were issued to various stakeholders such as Multi-Laterals, Power Distribution Companies (DISCOs) and Energy Service Companies (ESCOs) in consultation with the client (PEECA). From the responses, regulatory issues, bureaucratic delays and lack of awareness of EE among the investors and community were some of the factors highlighted. Considering the issue from a holistic perspective, the team reviewed various investment models in the energy efficiency sector from the developing and developed world and proposed two refined investment models, taking into account the factors highlighted in the questionnaire and addressing the political, social and environmental issues involved. The team believes that the policy proposal will help PEECA manage the demand side of electricity more effectively and help reduce the consumption of fossil fuels, and GHG emissions. This will encourage the people of Punjab to live within the finite resources of earth and act as a form of stewardship towards future generations. It will further improve the lives of millions since climate change is the cause of frequent floods in Pakistan and damages are caused due to this calamity.
巴基斯坦公立学院太阳能融资模式的发展
旁遮普省是巴基斯坦最大的省份,占其人口的53%。由于负荷需求以每年10%的速度快速增长,旁遮普目前面临着5000兆瓦的巨大供需缺口。旁遮普占巴基斯坦总发电量的三分之二,受电力负荷减少造成的短缺、经济和社会后果影响最严重。低效的能源工业过程、建筑设计和消费者用电推高了总需求和峰值需求,对现有能源供应造成巨大压力。认识到这一问题,旁遮普省政府于2015年成立了旁遮普节能和能源效率机构(PEECA),以促进、制定和实施省一级的能效项目和政策。为了继续扩大旁遮普省能源效率项目的范围和规模,除了政府的直接资助外,来自其他实体(如国有企业和私人投资者)的货币投资也很重要。然而,在吸引私人投资者投资电子电气相关项目方面存在各种挑战。为了全面了解所涉及的挑战,在与客户(PEECA)协商后,向多方利益相关者(如多边机构、配电公司(DISCOs)和能源服务公司(esco))发放了问卷。从回应来看,监管问题、官僚主义延误以及投资者和社区缺乏对EE的认识是一些突出的因素。小组从整体角度考虑这个问题,审查了发展中国家和发达国家在能源效率部门的各种投资模式,并提出了两种改进的投资模式,考虑到调查表中强调的因素,并处理所涉及的政治、社会和环境问题。该团队认为,该政策建议将有助于PEECA更有效地管理电力需求侧,并有助于减少化石燃料的消耗和温室气体的排放。这将鼓励旁遮普人民在有限的地球资源中生活,并作为对子孙后代的一种管理形式。它将进一步改善数百万人的生活,因为气候变化是巴基斯坦频繁发生洪水的原因,这场灾难造成了损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信