Barriers to Entry

Angela Cotey
{"title":"Barriers to Entry","authors":"Angela Cotey","doi":"10.1787/growth-2009-graph4_13-en","DOIUrl":null,"url":null,"abstract":"Since passage of the American Recovery and Reinvestment Act by the U.S. Congress in February 2009, U.S. high-speed rail development has become a very possibility. The Bill included $8 billion for high-speed and intercity passenger rail projects, prompting states to secure their share of the funds. This article discusses the planning and financing by states for development of high-speed rail, which is primarily contingent on compliance with a firm set of policies aimed at protecting the current freight-rail infrastructure which is operated by Class I host railroads. A majority of proposals on the table call for upgrading existing track to accommodate passenger trains at speeds between 79 and 110 mph.","PeriodicalId":436962,"journal":{"name":"Progressive Railroading","volume":"69 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Progressive Railroading","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1787/growth-2009-graph4_13-en","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Since passage of the American Recovery and Reinvestment Act by the U.S. Congress in February 2009, U.S. high-speed rail development has become a very possibility. The Bill included $8 billion for high-speed and intercity passenger rail projects, prompting states to secure their share of the funds. This article discusses the planning and financing by states for development of high-speed rail, which is primarily contingent on compliance with a firm set of policies aimed at protecting the current freight-rail infrastructure which is operated by Class I host railroads. A majority of proposals on the table call for upgrading existing track to accommodate passenger trains at speeds between 79 and 110 mph.
进入壁垒
自2009年2月美国国会通过《美国复苏与再投资法案》以来,美国发展高铁已成为一种非常可能的事情。该法案包括80亿美元用于高速和城际客运铁路项目,促使各州确保自己的资金份额。本文讨论了各州对高速铁路发展的规划和融资,这主要取决于是否遵守一套旨在保护目前由一级主办铁路运营的货运铁路基础设施的坚定政策。大多数提案要求升级现有轨道,以容纳时速在79至110英里之间的客运列车。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信