{"title":"An Enhanced Discrete Bees Algorithm for Resource Constrained Optimization Problems","authors":"Mohamed Amine Nemmich, F. Debbat, M. Slimane","doi":"10.4114/intartif.vol22iss64pp123-134","DOIUrl":null,"url":null,"abstract":"In this paper, we propose a novel efficient model based on Bees Algorithm (BA) for the Resource-Constrained Project Scheduling Problem (RCPSP). The studied RCPSP is a NP-hard combinatorial optimization problem which involves resource, precedence, and temporal constraints. It has been applied to many applications. The main objective is to minimize the expected makespan of the project. The proposed model, named Enhanced Discrete Bees Algorithm (EDBA), iteratively solves the RCPSP by utilizing intelligent foraging behaviors of honey bees. The potential solution is represented by the multidimensional bee, where the activity list representation (AL) is considered. This projection involves using the Serial Schedule Generation Scheme (SSGS) as decoding procedure to construct the active schedules. In addition, the conventional local search of the basic BA is replaced by a neighboring technique, based on the swap operator, which takes into account the specificity of the solution space of project scheduling problems and reduces the number of parameters to be tuned. The proposed EDBA is tested on well-known benchmark problem instance sets from Project Scheduling Problem Library (PSPLIB) and compared with other approaches from the literature. The promising computational results reveal the effectiveness of the proposed approach for solving the RCPSP problems of various scales.","PeriodicalId":176050,"journal":{"name":"Inteligencia Artif.","volume":"124 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inteligencia Artif.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4114/intartif.vol22iss64pp123-134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In this paper, we propose a novel efficient model based on Bees Algorithm (BA) for the Resource-Constrained Project Scheduling Problem (RCPSP). The studied RCPSP is a NP-hard combinatorial optimization problem which involves resource, precedence, and temporal constraints. It has been applied to many applications. The main objective is to minimize the expected makespan of the project. The proposed model, named Enhanced Discrete Bees Algorithm (EDBA), iteratively solves the RCPSP by utilizing intelligent foraging behaviors of honey bees. The potential solution is represented by the multidimensional bee, where the activity list representation (AL) is considered. This projection involves using the Serial Schedule Generation Scheme (SSGS) as decoding procedure to construct the active schedules. In addition, the conventional local search of the basic BA is replaced by a neighboring technique, based on the swap operator, which takes into account the specificity of the solution space of project scheduling problems and reduces the number of parameters to be tuned. The proposed EDBA is tested on well-known benchmark problem instance sets from Project Scheduling Problem Library (PSPLIB) and compared with other approaches from the literature. The promising computational results reveal the effectiveness of the proposed approach for solving the RCPSP problems of various scales.
资源约束优化问题的一种增强离散蜜蜂算法
针对资源受限项目调度问题,提出了一种基于蜜蜂算法(BA)的高效模型。所研究的RCPSP是一个涉及资源约束、优先约束和时间约束的NP-hard组合优化问题。它已被应用于许多应用中。主要目标是最小化项目的预期完工时间。该模型利用蜜蜂的智能觅食行为,迭代求解RCPSP问题,称为增强离散蜜蜂算法(Enhanced Discrete Bees Algorithm, EDBA)。潜在的解决方案由多维蜜蜂表示,其中考虑了活动列表表示(AL)。该投影涉及到使用串行调度生成方案(SSGS)作为解码过程来构造活动调度。此外,基于交换算子的邻域搜索技术取代了传统的基本BA的局部搜索,该技术考虑了项目调度问题解空间的特殊性,减少了需要调优的参数数量。该方法在项目调度问题库(PSPLIB)中著名的基准问题实例集上进行了测试,并与文献中的其他方法进行了比较。令人满意的计算结果表明,所提出的方法对于求解各种尺度的RCPSP问题是有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信