High power long pulse tests of the IFP-CNR dummy load for the European ITER gyrotron

W. Bin, A. Bruschi, F. Dell'Era, D. Minelli, A. Nardone, A. Simonetto, N. Spinicchia, Koji Takahashi, R. Ikeda, Y. Oda, M. Terakado, N. Tsubota, Takashi Aoki, Masashi Hayashibara, K. Sakamoto
{"title":"High power long pulse tests of the IFP-CNR dummy load for the European ITER gyrotron","authors":"W. Bin, A. Bruschi, F. Dell'Era, D. Minelli, A. Nardone, A. Simonetto, N. Spinicchia, Koji Takahashi, R. Ikeda, Y. Oda, M. Terakado, N. Tsubota, Takashi Aoki, Masashi Hayashibara, K. Sakamoto","doi":"10.1109/SOFE.2015.7482271","DOIUrl":null,"url":null,"abstract":"The development of high power gyrotrons needs matched loads with good performance capable of absorbing and measuring powers as high as 1 MW in ITER and higher (up to two times) in future devices like DEMO. At IFP-CNR (Milano), several spherical loads were developed with identical absorbing geometry but different heat removal systems for operation with pulse lengths from a few ms to CW. A dummy load designed for 170 GHz/2 MW has been constructed in the frame of the development programme of European gyrotron for ITER. The first prototype hemisphere of this load, joined with an uncoated one, has been successfully tested with long pulses and under vacuum using the JAEA gyrotron for ITER in Naka. The symmetry of the system is such that the equivalent power load of the absorbing (coated) hemisphere is doubled when the second one is reflective (uncoated), with almost unchanged distribution with respect to a fully coated load. The tests demonstrate the capability of the IFP-CNR load to withstand and measure radiation at an equivalent power in excess of 1.5 MW. Gyrotron pulses with increasing power and pulse length have been performed in the load and are reported. The maximum equivalent power load reached in the tests was ~ 1.8 MW for 15 s while the longest pulse was 300 s, at ~ 1 MW. During the experiments, the temperatures of either the load or the preload were monitored using thermocouples and multiple infrared cameras. The results of the tests are described in the paper.","PeriodicalId":278628,"journal":{"name":"2015 IEEE 26th Symposium on Fusion Engineering (SOFE)","volume":"12 1-4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 26th Symposium on Fusion Engineering (SOFE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SOFE.2015.7482271","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The development of high power gyrotrons needs matched loads with good performance capable of absorbing and measuring powers as high as 1 MW in ITER and higher (up to two times) in future devices like DEMO. At IFP-CNR (Milano), several spherical loads were developed with identical absorbing geometry but different heat removal systems for operation with pulse lengths from a few ms to CW. A dummy load designed for 170 GHz/2 MW has been constructed in the frame of the development programme of European gyrotron for ITER. The first prototype hemisphere of this load, joined with an uncoated one, has been successfully tested with long pulses and under vacuum using the JAEA gyrotron for ITER in Naka. The symmetry of the system is such that the equivalent power load of the absorbing (coated) hemisphere is doubled when the second one is reflective (uncoated), with almost unchanged distribution with respect to a fully coated load. The tests demonstrate the capability of the IFP-CNR load to withstand and measure radiation at an equivalent power in excess of 1.5 MW. Gyrotron pulses with increasing power and pulse length have been performed in the load and are reported. The maximum equivalent power load reached in the tests was ~ 1.8 MW for 15 s while the longest pulse was 300 s, at ~ 1 MW. During the experiments, the temperatures of either the load or the preload were monitored using thermocouples and multiple infrared cameras. The results of the tests are described in the paper.
欧洲ITER回旋加速器IFP-CNR虚拟负载的高功率长脉冲试验
高功率回旋管的发展需要具有良好性能的匹配负载,能够吸收和测量ITER中高达1mw的功率,并且在未来的设备中(如DEMO)能够吸收和测量更高(高达两倍)的功率。在IFP-CNR (Milano),开发了几种具有相同吸收几何形状但不同散热系统的球形负载,用于脉冲长度从几毫秒到连续波不等的操作。在欧洲ITER回旋加速器发展计划的框架内,设计了一个170 GHz/2 MW的虚拟负载。这个负载的第一个原型半球,与一个未涂覆的半球连接在一起,已经成功地在长脉冲和真空下使用日本原子能机构(JAEA)的ITER回旋加速器进行了测试。系统的对称性是这样的,当第二个半球是反射半球(未涂覆)时,吸收半球(涂覆)的等效功率负载增加一倍,相对于完全涂覆的负载,其分布几乎不变。测试证明了IFP-CNR负载承受和测量等效功率超过1.5 MW的辐射的能力。在负载中进行了功率和脉冲长度不断增大的回旋管脉冲实验,并有相关报道。试验的最大等效功率负载为~ 1.8 MW,持续时间为15 s,最长脉冲为~ 1 MW,持续时间为300 s。在实验过程中,使用热电偶和多个红外摄像机监测负载或预负载的温度。本文介绍了试验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书