{"title":"CONTRACT MANAGEMENT","authors":"Zhu Hong-jua","doi":"10.1108/978-1-78754-605-920181004","DOIUrl":null,"url":null,"abstract":"The article introduce two methods to build contract network,parallel method and integral-partial method,analyzes their advantages and disadvantages,illustrates the type of contract and the management of unit price contract,and points out the importance of contract management on engineering management,which has significance to increase engineering quality.","PeriodicalId":410173,"journal":{"name":"Right First Time","volume":"121 19","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Right First Time","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/978-1-78754-605-920181004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The article introduce two methods to build contract network,parallel method and integral-partial method,analyzes their advantages and disadvantages,illustrates the type of contract and the management of unit price contract,and points out the importance of contract management on engineering management,which has significance to increase engineering quality.