{"title":"The Grautschenhof contract – Construction of an intermediate access under complex local conditions","authors":"Frank Klais, Petra Wolf, W. Lienhart","doi":"10.1002/geot.201700052","DOIUrl":null,"url":null,"abstract":"With the start of construction on the third tunnelling contract, work has now started on all sections of the Semmering Base Tunnel. The Tunnel Grautschenhof contract is a challenging construction project with numerous unusual problems. Complex ground conditions make extensive grouting necessary. Numerous constraints above‐ground, like high‐pressure gas pipelines require monitoring and protection measures. Since the start in May 2016, two shafts, the first of three caverns and the first metres of the running tunnels have already been driven. In parallel to this, the works above ground to create two site facilities areas are now largely complete.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201700052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

With the start of construction on the third tunnelling contract, work has now started on all sections of the Semmering Base Tunnel. The Tunnel Grautschenhof contract is a challenging construction project with numerous unusual problems. Complex ground conditions make extensive grouting necessary. Numerous constraints above‐ground, like high‐pressure gas pipelines require monitoring and protection measures. Since the start in May 2016, two shafts, the first of three caverns and the first metres of the running tunnels have already been driven. In parallel to this, the works above ground to create two site facilities areas are now largely complete.
Grautschenhof合同-在复杂的当地条件下建造中间通道
随着第三份隧道施工合同的开始,塞默林基地隧道的所有部分现已开始施工。格劳茨申霍夫隧道合同是一项具有挑战性的建设项目,存在许多不寻常的问题。复杂的地面条件使得大量的注浆成为必要。地面上的许多限制,如高压天然气管道,需要监控和保护措施。自2016年5月开始以来,两个竖井,三个洞穴中的第一个洞穴和运行隧道的第一米已经被驱动。与此同时,地面上创建两个场地设施区域的工程现已基本完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信