Identifikasi Potensi Pembangkit Listrik Tenaga Hybrid (PLTH) Angin dan Surya di Kabupaten Aceh Besar

Fadhli Fadhli, Ichsan Syahputra
{"title":"Identifikasi Potensi Pembangkit Listrik Tenaga Hybrid (PLTH) Angin dan Surya di Kabupaten Aceh Besar","authors":"Fadhli Fadhli, Ichsan Syahputra","doi":"10.30601/JTSU.V5I2.287","DOIUrl":null,"url":null,"abstract":"The Wind and Solar Hybrid Power Plant (PLTH) research is expected to be able to contribute to assist the development of electricity supply in Aceh and gradually reduce and substitute the use of fossil energy. Hybrid Power Plant (PLTH) by combining wind energy and solar energy is a sustainable electricity supply technology that is increasingly popular because it is environmentally friendly and is not much constrained by land conversion. This research by measuring wind speed and solar radiation was carried out at selected locations in Aceh Besar District namely Lhoksedu, Lampuuk, Lambadeuk and Krueng Raya. The Lhokseudu location has a maximum wind speed of 6.3 m / sec and an average wind speed of 1 m / sec while solar radiation is a maximum of 764.90 W / m2, an average of 467.87 W / m2 and a minimum of 155.40 W / m2. Location Lampuuk maximum wind speed of 7.6 m / sec and average wind speed of 1.1 m / sec while maximum solar radiation is 1193 W / m2, average 678.74 W / m2 and minimum 30.20 W / m2. The Lambadeuk location has a maximum wind speed of 13 m / sec and an average wind speed of 1.3 m / sec while maximum solar radiation is 1589 W / m2, an average of 626.01 W / m2 and a minimum of 38.50 W / m2. The location of Krueng Raya is a maximum wind speed of 9.4 m / sec and an average wind speed of 3.1 m / sec while solar radiation is a maximum of 1019 W / m2, an average of 811.65 W / m2 and a minimum of 493.50 W / m2. Based on the results of data collection and analysis of wind speed and solar radiation that have been carried out including using secondary data / wind speed data from Blang Bintang BMKG Station at Sultan Iskandar Muda Airport and BMKG Indrapuri Station, it can be concluded that the more potential for PLTH development is the location Lambadeuk and Krueng Raya.","PeriodicalId":336743,"journal":{"name":"Jurnal Teknik Sipil Unaya","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil Unaya","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30601/JTSU.V5I2.287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Wind and Solar Hybrid Power Plant (PLTH) research is expected to be able to contribute to assist the development of electricity supply in Aceh and gradually reduce and substitute the use of fossil energy. Hybrid Power Plant (PLTH) by combining wind energy and solar energy is a sustainable electricity supply technology that is increasingly popular because it is environmentally friendly and is not much constrained by land conversion. This research by measuring wind speed and solar radiation was carried out at selected locations in Aceh Besar District namely Lhoksedu, Lampuuk, Lambadeuk and Krueng Raya. The Lhokseudu location has a maximum wind speed of 6.3 m / sec and an average wind speed of 1 m / sec while solar radiation is a maximum of 764.90 W / m2, an average of 467.87 W / m2 and a minimum of 155.40 W / m2. Location Lampuuk maximum wind speed of 7.6 m / sec and average wind speed of 1.1 m / sec while maximum solar radiation is 1193 W / m2, average 678.74 W / m2 and minimum 30.20 W / m2. The Lambadeuk location has a maximum wind speed of 13 m / sec and an average wind speed of 1.3 m / sec while maximum solar radiation is 1589 W / m2, an average of 626.01 W / m2 and a minimum of 38.50 W / m2. The location of Krueng Raya is a maximum wind speed of 9.4 m / sec and an average wind speed of 3.1 m / sec while solar radiation is a maximum of 1019 W / m2, an average of 811.65 W / m2 and a minimum of 493.50 W / m2. Based on the results of data collection and analysis of wind speed and solar radiation that have been carried out including using secondary data / wind speed data from Blang Bintang BMKG Station at Sultan Iskandar Muda Airport and BMKG Indrapuri Station, it can be concluded that the more potential for PLTH development is the location Lambadeuk and Krueng Raya.
风能和太阳能混合动力发电厂(PLTH)的研究预计将有助于协助亚齐的电力供应发展,并逐步减少和替代化石能源的使用。结合风能和太阳能的混合电厂(PLTH)是一种可持续的电力供应技术,因为它对环境友好,不受土地转换的限制而越来越受欢迎。这项通过测量风速和太阳辐射的研究是在亚齐Besar区的选定地点进行的,即Lhoksedu、Lampuuk、Lambadeuk和Krueng Raya。Lhokseudu地区最大风速为6.3 m / s,平均风速为1 m / s,太阳辐射最大值为764.90 W / m2,平均值为467.87 W / m2,最小值为155.40 W / m2。兰浦岛最大风速7.6 m / s,平均风速1.1 m / s,最大太阳辐射1193 W / m2,平均678.74 W / m2,最小30.20 W / m2。Lambadeuk地区最大风速为13 m / s,平均风速为1.3 m / s,最大太阳辐射1589 W / m2,平均626.01 W / m2,最小38.50 W / m2。Krueng Raya的最大风速为9.4 m / s,平均风速为3.1 m / s,太阳辐射最大值为1019 W / m2,平均值为811.65 W / m2,最小值为493.50 W / m2。根据已经进行的风速和太阳辐射的数据收集和分析结果,包括使用苏丹依斯干达穆达机场的Blang Bintang BMKG站和BMKG Indrapuri站的二次数据/风速数据,可以得出结论,Lambadeuk和Krueng Raya是PLTH发展潜力更大的位置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信