A fuzzy‐based analytic approach to collaborative decision making for construction teams

Hongmei Yang, C. Anumba, J. Kamara, P. Carrillo
{"title":"A fuzzy‐based analytic approach to collaborative decision making for construction teams","authors":"Hongmei Yang, C. Anumba, J. Kamara, P. Carrillo","doi":"10.1108/EUM0000000006246","DOIUrl":null,"url":null,"abstract":"Describes a study that exploits the potential of fuzzy systems in construction through the development of a decision support system which is capable of handling fuzziness in the collaborative decision‐making process. The proposed system is intended to provide an objective and rational framework within which collaborative decisions can be made by virtual construction project teams. Given the often linguistic nature of the weightings ascribed by individual disciplines to decision criteria, the proposed system will utilise fuzzy systems theory to rank criteria and recommend an optimal decision alternative. Presents an example to illustrate how the proposed tool works.","PeriodicalId":296825,"journal":{"name":"Logistics Information Management","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Logistics Information Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/EUM0000000006246","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19

Abstract

Describes a study that exploits the potential of fuzzy systems in construction through the development of a decision support system which is capable of handling fuzziness in the collaborative decision‐making process. The proposed system is intended to provide an objective and rational framework within which collaborative decisions can be made by virtual construction project teams. Given the often linguistic nature of the weightings ascribed by individual disciplines to decision criteria, the proposed system will utilise fuzzy systems theory to rank criteria and recommend an optimal decision alternative. Presents an example to illustrate how the proposed tool works.
基于模糊分析的施工团队协同决策方法
描述了一项研究,该研究通过开发决策支持系统来利用模糊系统在构建中的潜力,该系统能够处理协作决策过程中的模糊性。所建议的系统旨在提供一个客观和合理的框架,在该框架内,虚拟建筑项目团队可以做出协作决策。考虑到各个学科对决策标准的权重通常具有语言性质,所提出的系统将利用模糊系统理论对标准进行排序并推荐最佳决策方案。给出一个示例来说明所建议的工具是如何工作的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信