{"title":"Pengaruh Susut Energi (Losses) Pada Jaringan Distribusi (Studi Kasus: di PT. Krakatau Daya listrik)","authors":"Desmira Desmira","doi":"10.33322/ENERGI.V12I2.1079","DOIUrl":null,"url":null,"abstract":"PT. Krakatau Daya Listrik is a company that distributes electricity. In the distribution process of electricity distribution from generators to consumers, there is an inconsistency with the data on electrical energy supplied from power plants to the energy that is consumed. consumers are also the background of this research. The research objective is how much energy losses (losses) in the conductor that flows from the generator to the maximum and minimum consumer consumption during 2018. This research method is 1. Preparation stage by identifying problems with energy loss (Losess), 2. Pre-Research Stage This stage is looking for reference sources that will be used either from books, internet, thesis results or practical work related to the theme taken namely energy loss, 3. Data Selection Stage This stage is data collection in accordance with the targets and objectives of this study. The results of the study were the minimum losses recorded during 2018, which was (-2.041%), and the maximum value was (1.588%). The conclusion of this research is that the smaller the size of the carrier, it means that the lower the cost of distribution. And if the smaller the size that is on the conductor, it means that the voltage drop and the average total value of distribution losses per year will be even greater.","PeriodicalId":377082,"journal":{"name":"Energi & Kelistrikan","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energi & Kelistrikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33322/ENERGI.V12I2.1079","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
PT. Krakatau Daya Listrik is a company that distributes electricity. In the distribution process of electricity distribution from generators to consumers, there is an inconsistency with the data on electrical energy supplied from power plants to the energy that is consumed. consumers are also the background of this research. The research objective is how much energy losses (losses) in the conductor that flows from the generator to the maximum and minimum consumer consumption during 2018. This research method is 1. Preparation stage by identifying problems with energy loss (Losess), 2. Pre-Research Stage This stage is looking for reference sources that will be used either from books, internet, thesis results or practical work related to the theme taken namely energy loss, 3. Data Selection Stage This stage is data collection in accordance with the targets and objectives of this study. The results of the study were the minimum losses recorded during 2018, which was (-2.041%), and the maximum value was (1.588%). The conclusion of this research is that the smaller the size of the carrier, it means that the lower the cost of distribution. And if the smaller the size that is on the conductor, it means that the voltage drop and the average total value of distribution losses per year will be even greater.
PT. Krakatau Daya Listrik是一家配电公司。在从发电机到消费者的配电过程中,电厂提供的电能与被消耗的电能的数据不一致。消费者也是本研究的背景。研究目标是2018年,从发电机流向最大和最小消费者消耗量的导体中的能量损失(损耗)。本研究方法为1。准备阶段通过识别能量损失问题(loss), 2。前期研究阶段这一阶段是寻找参考资料,将从书籍,互联网,论文结果或实际工作中使用的主题,即能量损失,3。这一阶段是根据本研究的目标和目的收集数据。研究结果为2018年记录的最小损失(-2.041%)和最大值(1.588%)。本研究的结论是,载体的规模越小,意味着配送成本越低。如果导体上的尺寸越小,则意味着电压降和每年配电损耗的平均总值将会更大。