Day-ahead coordinated scheduling of hydro and wind power generation system considering uncertainties

Yuanzheng Li, Tianyang Zhao, Chang Liu, Zhiyuan Yu, Kaicheng Li, L. Wu
{"title":"Day-ahead coordinated scheduling of hydro and wind power generation system considering uncertainties","authors":"Yuanzheng Li, Tianyang Zhao, Chang Liu, Zhiyuan Yu, Kaicheng Li, L. Wu","doi":"10.1109/icps.2018.8370003","DOIUrl":null,"url":null,"abstract":"This paper presents a day-ahead coordinated scheduling method of hydro and wind power generation system (HWPGS) with consideration of uncertainties. In this method, we first formulate the coordinated scheduling model with two-part price and power flow constraints, which can well manifest the fixed and variable economic benefits as well as the secure operation of HWPGS, respectively. Then, interval analysis is adopted to study effect of uncertain wind power, water inflow, and electricity load on the coordinated scheduling model. Finally, we use a real test system in a western area of China to conduct simulation studies, which verify the effectiveness of interval analysis and the effect of price mechanism on the day-ahead coordinated scheduling of HWPGS.","PeriodicalId":142445,"journal":{"name":"2018 IEEE/IAS 54th Industrial and Commercial Power Systems Technical Conference (I&CPS)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE/IAS 54th Industrial and Commercial Power Systems Technical Conference (I&CPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/icps.2018.8370003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

This paper presents a day-ahead coordinated scheduling method of hydro and wind power generation system (HWPGS) with consideration of uncertainties. In this method, we first formulate the coordinated scheduling model with two-part price and power flow constraints, which can well manifest the fixed and variable economic benefits as well as the secure operation of HWPGS, respectively. Then, interval analysis is adopted to study effect of uncertain wind power, water inflow, and electricity load on the coordinated scheduling model. Finally, we use a real test system in a western area of China to conduct simulation studies, which verify the effectiveness of interval analysis and the effect of price mechanism on the day-ahead coordinated scheduling of HWPGS.
考虑不确定性的水电和风电系统日前协调调度
提出了一种考虑不确定因素的水风发电系统日前协调调度方法。在该方法中,我们首先建立了价格和潮流两部分约束下的协调调度模型,该模型可以很好地体现HWPGS的固定经济效益和可变经济效益以及安全运行。然后,采用区间分析的方法研究了不确定风电、来水和电力负荷对协调调度模型的影响。最后,利用中国西部地区的一个实际测试系统进行了仿真研究,验证了区间分析的有效性和价格机制对HWPGS日前协调调度的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信