Research on ROI of BT project based on Singel-factor APT model

Hua Gao, Li-juan Wang
{"title":"Research on ROI of BT project based on Singel-factor APT model","authors":"Hua Gao, Li-juan Wang","doi":"10.1109/ICIFE.2010.5609486","DOIUrl":null,"url":null,"abstract":"ROI of BT projects is involved in the benefit distribution and risk allocation between BT project initiator (local government or local governmental branch) and BT project investor and constractor (the private sector), and is related to the success or failure of BT projects. Up to now, the government departments have not promulgated laws or regulations about how to make sure ROI of BT project. So how to make sure ROI of BT project becomes the problem in the negotiation of BT project. Starting from international practice, the thesis sets down ROI of BT project in reference on Singel-factor APT model.","PeriodicalId":107970,"journal":{"name":"2010 2nd IEEE International Conference on Information and Financial Engineering","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 2nd IEEE International Conference on Information and Financial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIFE.2010.5609486","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

ROI of BT projects is involved in the benefit distribution and risk allocation between BT project initiator (local government or local governmental branch) and BT project investor and constractor (the private sector), and is related to the success or failure of BT projects. Up to now, the government departments have not promulgated laws or regulations about how to make sure ROI of BT project. So how to make sure ROI of BT project becomes the problem in the negotiation of BT project. Starting from international practice, the thesis sets down ROI of BT project in reference on Singel-factor APT model.
基于单因素APT模型的BT项目投资回报率研究
BT项目的投资回报率涉及到BT项目发起人(地方政府或地方政府分支机构)与BT项目投资者和建设者(私营部门)之间的利益分配和风险分配,关系到BT项目的成败。到目前为止,政府部门还没有出台关于如何确保BT项目投资回报率的法律法规。因此,如何确保电信项目的投资回报率成为电信项目谈判中的问题。本文从国际实践出发,借鉴单因素APT模型,确定了BT项目的投资回报率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书