Analisis kelayakan investasi penambangan batubara di PT. Cipta Kridatama site PT. KIM, Kabupaten Bungo, Provinsi Jambi

Qurratul Ayun, R. Juniah, Azwardi
{"title":"Analisis kelayakan investasi penambangan batubara di PT. Cipta Kridatama site PT. KIM, Kabupaten Bungo, Provinsi Jambi","authors":"Qurratul Ayun, R. Juniah, Azwardi","doi":"10.30556/jtmb.vol19.no1.2023.1327","DOIUrl":null,"url":null,"abstract":"Indonesia economic development cannot be separated from the role of natural resources, one of the natural resources that currently supports the Indonesian economy is coal. This research was conducted in order to see the prospects for coal mining activities at PT. Cipta Kridatama, site PT. Kuansing Inti Makmur (PT KIM), Bungo Regency, Jambi province through an analysis of management strategies in the form of investment feasibility. The research methodology used is descriptive qualitative in nature referring to quantitative studies, comparative studies (comparisons), and correlational studies. Data collection techniques are carried out by: field research, literature study and secondary data collection such as RKAB of the company. Based on field research, the data obtained included cropline roofs and M4 floor seam, coal strike and dip, overall highwall slope and outcrop area (section). The results of the investment feasibility study were obtained from coal resources based on a stripping ratio (SR) of 1:4.56. From the calculation results, the net present value (NPV) is greater than 0, which is 16,169,241,885, so it can be concluded that this project is considered economical and feasible to mine. The internal rate of return (IRR) is 19.807%, means that PT. Cipta Kridatama was able to return the invested capital with an increase in interest rates reaching 19.807%. Meanwhile, based on the payback period (PBP) calculation, it shows that the time needed for the investment capital to return is 5.6 years, this shows that the payback period is smaller than the project implementation period. The project ratio value (PI)>1 is 3.9537 which means the project is feasible to operate. The calculation has adjusted the discount rate, so the present value (PV) of coal mining PT. Cipta Kridatama of IDR 17,981,921,072.4 according to the discount level. Benefit cost ratio (BCR) value from PT. Cipta Kridatama is 24.66, which means the project is feasible to operate with the profits from the project are greater than the expenses so that the project is acceptable or feasible to continue.","PeriodicalId":118039,"journal":{"name":"Jurnal Teknologi Mineral dan Batubara","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknologi Mineral dan Batubara","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30556/jtmb.vol19.no1.2023.1327","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Indonesia economic development cannot be separated from the role of natural resources, one of the natural resources that currently supports the Indonesian economy is coal. This research was conducted in order to see the prospects for coal mining activities at PT. Cipta Kridatama, site PT. Kuansing Inti Makmur (PT KIM), Bungo Regency, Jambi province through an analysis of management strategies in the form of investment feasibility. The research methodology used is descriptive qualitative in nature referring to quantitative studies, comparative studies (comparisons), and correlational studies. Data collection techniques are carried out by: field research, literature study and secondary data collection such as RKAB of the company. Based on field research, the data obtained included cropline roofs and M4 floor seam, coal strike and dip, overall highwall slope and outcrop area (section). The results of the investment feasibility study were obtained from coal resources based on a stripping ratio (SR) of 1:4.56. From the calculation results, the net present value (NPV) is greater than 0, which is 16,169,241,885, so it can be concluded that this project is considered economical and feasible to mine. The internal rate of return (IRR) is 19.807%, means that PT. Cipta Kridatama was able to return the invested capital with an increase in interest rates reaching 19.807%. Meanwhile, based on the payback period (PBP) calculation, it shows that the time needed for the investment capital to return is 5.6 years, this shows that the payback period is smaller than the project implementation period. The project ratio value (PI)>1 is 3.9537 which means the project is feasible to operate. The calculation has adjusted the discount rate, so the present value (PV) of coal mining PT. Cipta Kridatama of IDR 17,981,921,072.4 according to the discount level. Benefit cost ratio (BCR) value from PT. Cipta Kridatama is 24.66, which means the project is feasible to operate with the profits from the project are greater than the expenses so that the project is acceptable or feasible to continue.
印尼的经济发展离不开自然资源的作用,目前支撑印尼经济的自然资源之一就是煤炭。进行这项研究是为了通过对投资可行性形式的管理战略的分析,了解占碑省Bungo Regency Kuansing Inti Makmur (PT KIM) site . Cipta Kridatama煤矿开采活动的前景。使用的研究方法本质上是描述性定性的,涉及定量研究,比较研究(比较)和相关研究。数据收集技术采用:实地调研、文献研究、公司RKAB等二次数据收集。在野外调研的基础上,获得了包括cropline顶板和M4底板煤层、煤层走向和倾角、总高壁坡度和露头面积(剖面)等资料。以1:4.56的剥脱比(SR)为煤资源进行了投资可行性研究。从计算结果来看,净现值(NPV)大于0,为16,169,241,885,认为该项目经济可行。内部收益率(IRR)为19.807%,意味着PT. Cipta Kridatama能够以19.807%的利率增长回报投入的资金。同时,根据投资回收期(PBP)计算,投资资金的回收期为5.6年,这表明投资回收期小于项目执行期。当项目比率值(PI)>1时为3.9537,说明该项目是可行的。计算中对贴现率进行了调整,根据贴现率计算,煤矿PT. Cipta Kridatama的现值(PV)为17,981,921,072.4印尼卢比。PT. Cipta Kridatama的效益成本比(BCR)值为24.66,即该项目是可行的,项目的利润大于费用,因此该项目是可以接受或可行的,可以继续下去。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信