{"title":"Overall fab efficiency [semiconductor manufacturing]","authors":"J. Bonal, C. Ortega, L. Rios, S. Aparicio, M. Fernandez, M. Rosendo, A. Sanchez, S. Malvar","doi":"10.1109/ASMC.1996.557970","DOIUrl":null,"url":null,"abstract":"The constant increase of the capital needed for a semiconductor facility has brought a huge interest in two methodologies: Theory of Constraints (TOC) and Total Productive Maintenance (TPM) which have been shown to be adequate in optimizing the return on capital equipment. This article shows that both methodologies are convergent. The appropriate use of both together can make it possible to maintain productivity improvement rates in the semiconductor business. The Overall Equipment Efficiency (OEE) measurements are the driver metrics for an effective TPM program. OEE measurements are easy to obtain, nevertheless, the analysis of these parameters requires a large amount of accurate data that are difficult to obtain in a production environment. In addition, it needs the dedication of a considerable amount of effort and human resources to improve in all the organizations (production, maintenance, engineering, etc.). It is widely accepted that bottlenecks should be entered in a TPM program, but for non-bottlenecks, it is not easy to determine which machines should enter the program, their target and their impact on the global fab efficiency. In this study we present a systematic method of approaching this problem.","PeriodicalId":325204,"journal":{"name":"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1996.557970","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

The constant increase of the capital needed for a semiconductor facility has brought a huge interest in two methodologies: Theory of Constraints (TOC) and Total Productive Maintenance (TPM) which have been shown to be adequate in optimizing the return on capital equipment. This article shows that both methodologies are convergent. The appropriate use of both together can make it possible to maintain productivity improvement rates in the semiconductor business. The Overall Equipment Efficiency (OEE) measurements are the driver metrics for an effective TPM program. OEE measurements are easy to obtain, nevertheless, the analysis of these parameters requires a large amount of accurate data that are difficult to obtain in a production environment. In addition, it needs the dedication of a considerable amount of effort and human resources to improve in all the organizations (production, maintenance, engineering, etc.). It is widely accepted that bottlenecks should be entered in a TPM program, but for non-bottlenecks, it is not easy to determine which machines should enter the program, their target and their impact on the global fab efficiency. In this study we present a systematic method of approaching this problem.
整体晶圆厂效率〔半导体制造〕
半导体设施所需资本的不断增加引起了人们对两种方法的极大兴趣:约束理论(TOC)和全面生产维护(TPM),这两种方法已被证明足以优化资本设备的回报。本文表明这两种方法是收敛的。两者的适当使用可以使半导体业务保持生产率的提高速度成为可能。总体设备效率(OEE)度量是有效TPM计划的驱动度量。OEE测量很容易获得,然而,对这些参数的分析需要大量准确的数据,而这些数据在生产环境中很难获得。此外,它需要在所有组织(生产、维护、工程等)中投入大量的精力和人力资源来改进。人们普遍认为应该在TPM计划中进入瓶颈,但对于非瓶颈,确定哪些机器应该进入该计划,其目标及其对全球晶圆厂效率的影响并不容易。在这项研究中,我们提出了一种系统的方法来解决这个问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信