KEY PERFORMANCE INDICATORS IN UPHOLDING SCOPE CREEP MANAGEMENT IN ROAD PROJECTS

C. Jayalath, K. Somarathna
{"title":"KEY PERFORMANCE INDICATORS IN UPHOLDING SCOPE CREEP MANAGEMENT IN ROAD PROJECTS","authors":"C. Jayalath, K. Somarathna","doi":"10.31705/WCS.2021.33","DOIUrl":null,"url":null,"abstract":"Scope creep has been a day-to-day occurrence in almost every major road project causing a considerable cost overrun with no early dimple. This paper offers a critical appraisal on the dominant causes behind scope creep in the road projects. A comprehensive literature survey was undertaken to explore the factors specifically contributing scope creep and various control measures that are adopted, among other purposes, in at least reducing the impact due to scope creep in the final delivery of road projects. The study included interviews with 15 experts to identify major issues and add their hands-on experience. A questionnaire survey was subsequently administered among 100 industrial personnel having a cost management background in order to evaluate the effectiveness of the key performance indicators (KPIs) in terms of taming scope creep. Results from the study showed that concomitant client instructions on additional features, unclear scope and incremental changes cause scope creep throughout the project. Among 53 KPIs identified, the most effective KPI that enables adequate control of scope creep in road projects is the cost efficiency ratio. The results enable comprehending the causes of scope creep and its resultant net effect on cost control.","PeriodicalId":320967,"journal":{"name":"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/WCS.2021.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Scope creep has been a day-to-day occurrence in almost every major road project causing a considerable cost overrun with no early dimple. This paper offers a critical appraisal on the dominant causes behind scope creep in the road projects. A comprehensive literature survey was undertaken to explore the factors specifically contributing scope creep and various control measures that are adopted, among other purposes, in at least reducing the impact due to scope creep in the final delivery of road projects. The study included interviews with 15 experts to identify major issues and add their hands-on experience. A questionnaire survey was subsequently administered among 100 industrial personnel having a cost management background in order to evaluate the effectiveness of the key performance indicators (KPIs) in terms of taming scope creep. Results from the study showed that concomitant client instructions on additional features, unclear scope and incremental changes cause scope creep throughout the project. Among 53 KPIs identified, the most effective KPI that enables adequate control of scope creep in road projects is the cost efficiency ratio. The results enable comprehending the causes of scope creep and its resultant net effect on cost control.
坚持道路项目范围蠕变管理的关键绩效指标
范围蠕变几乎在每个主要道路项目中每天都在发生,造成相当大的成本超支,而且没有早期的缺陷。本文对道路工程范围蠕变的主要原因进行了批判性评价。我们进行了一项全面的文献调查,以探讨具体造成范围蠕变的因素,以及采取的各种控制措施,除其他目的外,至少可以减少道路项目最终交付时范围蠕变的影响。这项研究采访了15位专家,以确定主要问题,并增加他们的实践经验。随后对100名具有成本管理背景的工业人员进行了问卷调查,以评估关键绩效指标(kpi)在控制范围蔓延方面的有效性。研究结果表明,伴随而来的客户对附加功能、不明确的范围和增量变化的指示导致了整个项目的范围蔓延。在确定的53个KPI中,能够充分控制道路项目范围蠕变的最有效的KPI是成本效率比。这些结果使我们能够理解范围蔓延的原因及其对成本控制的净影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信