Evaluating substation reliability using a combined state enumeration and linear programming method

Wenyuan Li, W. Wangdee, Andre Tache, P. Choudhury
{"title":"Evaluating substation reliability using a combined state enumeration and linear programming method","authors":"Wenyuan Li, W. Wangdee, Andre Tache, P. Choudhury","doi":"10.1109/PESMG.2013.6672283","DOIUrl":null,"url":null,"abstract":"Substation reliability evaluation is one of the important tasks in power system reliability since substation originated (terminal-related) failures can have significant impact on both bulk transmission system and distribution system. A quantitative reliability assessment of a detailed substation topology is valuable to system planning and operation functions. This paper presents a combined state enumeration and linear programming method for substation reliability evaluation. A case study based on an actual system at BC Hydro is illustrated. The study results could prove useful for station planning and design to optimize an investment cost associated with an improvement of supply reliability.","PeriodicalId":433870,"journal":{"name":"2013 IEEE Power & Energy Society General Meeting","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESMG.2013.6672283","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Substation reliability evaluation is one of the important tasks in power system reliability since substation originated (terminal-related) failures can have significant impact on both bulk transmission system and distribution system. A quantitative reliability assessment of a detailed substation topology is valuable to system planning and operation functions. This paper presents a combined state enumeration and linear programming method for substation reliability evaluation. A case study based on an actual system at BC Hydro is illustrated. The study results could prove useful for station planning and design to optimize an investment cost associated with an improvement of supply reliability.
状态枚举与线性规划相结合的变电站可靠性评估方法
变电站可靠性评估是电力系统可靠性研究的重要内容之一,因为变电站始发(终端相关)故障会对大容量输电系统和配电系统产生重大影响。详细的变电站拓扑结构的定量可靠性评估对系统规划和运行功能是有价值的。提出了一种状态枚举与线性规划相结合的变电站可靠性评估方法。以卑诗水电公司的实际系统为例进行了分析。研究结果可用于车站规划和设计,以优化与改善供应可靠性相关的投资成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信