{"title":"Application of the Hungarian Method (Assignment) in Optimizing the Division of Working Hours at CV. Comrade Gemilang's Participation (PKG)","authors":"Forry Fortuna Survio S","doi":"10.55445/jt.v8i02.28","DOIUrl":null,"url":null,"abstract":"The purpose of writing \"Application of the hungarian method (assignment) in optimizing the division of work hours at CV. Partpresisi Kawan Gemilang (PKG)\" is to calculate the assignment problem so that work can be done evenly and minimize losses due to unemployed workers. As well as to streamline the division of tasks so that time is more optimal. With so many requests for brake bolts and components, they are trying to solve the problem with the duration of the process from checking to smoothing being shorter. In order not to delay the time until the refinement time is delayed. Then obtained the results of solving the assignment problem with the Hungarian method Mr. Agus with a small bolt smoothing job, Mr. Susanto with a nut smoothing job, Mr. Yanto with a matic motorbike brake lining job, Mr. Ahmad with a motorbike brake cap smoothing job, Mr. Wardi with a big bolt smoothing job.","PeriodicalId":442343,"journal":{"name":"Jurnal Teknovasi","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknovasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55445/jt.v8i02.28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The purpose of writing "Application of the hungarian method (assignment) in optimizing the division of work hours at CV. Partpresisi Kawan Gemilang (PKG)" is to calculate the assignment problem so that work can be done evenly and minimize losses due to unemployed workers. As well as to streamline the division of tasks so that time is more optimal. With so many requests for brake bolts and components, they are trying to solve the problem with the duration of the process from checking to smoothing being shorter. In order not to delay the time until the refinement time is delayed. Then obtained the results of solving the assignment problem with the Hungarian method Mr. Agus with a small bolt smoothing job, Mr. Susanto with a nut smoothing job, Mr. Yanto with a matic motorbike brake lining job, Mr. Ahmad with a motorbike brake cap smoothing job, Mr. Wardi with a big bolt smoothing job.