Organizational congestion in large-scale software development

K. Ballman, L. Votta
{"title":"Organizational congestion in large-scale software development","authors":"K. Ballman, L. Votta","doi":"10.1109/SPCON.1994.344416","DOIUrl":null,"url":null,"abstract":"Many software projects seek to shorten the development interval-the time from project inception to final release. To do this effectively, we must understand the mechanisms which increase these intervals, especially in large-scale software production. A significant portion of an individual feature interval seems to consist of the time lost while developers wait for meetings. We have created a simple model which relates the average waiting time to the number of meetings in developers' calendars. Generalizing from this model, we propose a change in the software inspection process. We hope this proposal will lead to further experiments. We present the motivations for our investigation, provide background information relevant to the general goals of our work, and briefly discuss related work. We then describe our model and the results of simulation runs. This is followed by a discussion of the implications with respect to large-scale software development. Finally, we offer our conclusions and suggest some solutions which we believe merit investigation.<<ETX>>","PeriodicalId":163642,"journal":{"name":"Proceedings of the Third International Conference on the Software Process. Applying the Software Process","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Third International Conference on the Software Process. Applying the Software Process","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SPCON.1994.344416","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

Abstract

Many software projects seek to shorten the development interval-the time from project inception to final release. To do this effectively, we must understand the mechanisms which increase these intervals, especially in large-scale software production. A significant portion of an individual feature interval seems to consist of the time lost while developers wait for meetings. We have created a simple model which relates the average waiting time to the number of meetings in developers' calendars. Generalizing from this model, we propose a change in the software inspection process. We hope this proposal will lead to further experiments. We present the motivations for our investigation, provide background information relevant to the general goals of our work, and briefly discuss related work. We then describe our model and the results of simulation runs. This is followed by a discussion of the implications with respect to large-scale software development. Finally, we offer our conclusions and suggest some solutions which we believe merit investigation.<>
大规模软件开发中的组织拥塞
许多软件项目寻求缩短开发间隔——从项目开始到最终发布的时间。为了有效地做到这一点,我们必须了解增加这些间隔的机制,特别是在大规模的软件生产中。单个功能间隔的很大一部分似乎是开发人员等待会议的时间。我们创建了一个简单的模型,将平均等待时间与开发人员日历中的会议次数联系起来。在这个模型的基础上,我们提出了软件检查过程中的一个变化。我们希望这一建议将导致进一步的实验。我们介绍了我们调查的动机,提供了与我们工作的总体目标相关的背景信息,并简要讨论了相关工作。然后描述了我们的模型和仿真运行的结果。接下来是关于大规模软件开发的含义的讨论。最后给出了结论,并提出了一些我们认为值得研究的解决方案
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信