{"title":"Decentralized Model Predictive Control for N and P removal in wastewater treatment plants","authors":"X. Hongyang, C. Pedret, I. Santín, R. Vilanova","doi":"10.1109/ICSTCC.2018.8540675","DOIUrl":null,"url":null,"abstract":"Due to the complex and non linear character, wastewater treatment process is difficult to be controlled. And the demand for removing the pollutant, especially for nitrogen (N) and phosphorus (P), as well as reducing the cost of wastewater treatment plant (WWTP) is an important research topic. This paper applies PI control and decentralised model predictive control control to the combined phosphorus removal Benchmark Simulation Model 1 (BSMI-P) wastewater treatment process to enhance the P removal. A default control strategy which contains two control loops and is similar to the one given by the original version of BSMI was tested on BSMI-P. In addition, linear models have been identified and model predictive controllers implemented for each one of these loops. The simulation results showed that the MPC controllers are able to the controller performance in all the three weather conditions.","PeriodicalId":308427,"journal":{"name":"2018 22nd International Conference on System Theory, Control and Computing (ICSTCC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 22nd International Conference on System Theory, Control and Computing (ICSTCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSTCC.2018.8540675","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
Due to the complex and non linear character, wastewater treatment process is difficult to be controlled. And the demand for removing the pollutant, especially for nitrogen (N) and phosphorus (P), as well as reducing the cost of wastewater treatment plant (WWTP) is an important research topic. This paper applies PI control and decentralised model predictive control control to the combined phosphorus removal Benchmark Simulation Model 1 (BSMI-P) wastewater treatment process to enhance the P removal. A default control strategy which contains two control loops and is similar to the one given by the original version of BSMI was tested on BSMI-P. In addition, linear models have been identified and model predictive controllers implemented for each one of these loops. The simulation results showed that the MPC controllers are able to the controller performance in all the three weather conditions.