Live-working techniques on 220 kV long-span towers

Xi Sheng Sun
{"title":"Live-working techniques on 220 kV long-span towers","authors":"Xi Sheng Sun","doi":"10.1109/TDCLLM.1993.316235","DOIUrl":null,"url":null,"abstract":"This paper outlines integrated live-working techniques, designed by Harbin Power Bureau, to solve the problem of operating on 220 kV long-span towers. It also describes replacement methods for a whole string of suspension insulators and a whole string of tension insulators on on a live line, an oiling method for the release clips (suspension type) of conductors, an examination method for conductors and their accessories (including damping wire and its release clip, dampers), and a method of eliminating the detected defects on a live line. Also, this paper introduces a new self-made stretchable cable method using buckets and clamps, presents the design basis of such clamps and effective ways of testing clamps easily.<<ETX>>","PeriodicalId":198668,"journal":{"name":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1993.316235","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper outlines integrated live-working techniques, designed by Harbin Power Bureau, to solve the problem of operating on 220 kV long-span towers. It also describes replacement methods for a whole string of suspension insulators and a whole string of tension insulators on on a live line, an oiling method for the release clips (suspension type) of conductors, an examination method for conductors and their accessories (including damping wire and its release clip, dampers), and a method of eliminating the detected defects on a live line. Also, this paper introduces a new self-made stretchable cable method using buckets and clamps, presents the design basis of such clamps and effective ways of testing clamps easily.<>
220kv大跨度塔的现场作业技术
介绍了哈尔滨市电力局为解决220千伏大跨度塔的运行问题而设计的一体化带电作业技术。本发明还描述了带电线上整串悬挂式绝缘子和整串张力式绝缘子的更换方法、导线解除夹(悬挂式)的涂油方法、导线及其附件(包括阻尼线及其解除夹、阻尼器)的检查方法、带电线上检测到的缺陷的消除方法。本文还介绍了一种采用桶夹的自制拉伸索的新方法,介绍了这种夹具的设计依据和方便检测夹具的有效方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信