Re-Design of the Structure of the Batang I Industrial Flats Worker Building Using the Precast Concrete Method

Ridwan Riskyanto, Nasyiin Faqih, Suharto Suharto
{"title":"Re-Design of the Structure of the Batang I Industrial Flats Worker Building Using the Precast Concrete Method","authors":"Ridwan Riskyanto, Nasyiin Faqih, Suharto Suharto","doi":"10.30736/cvl.v8i1.1046","DOIUrl":null,"url":null,"abstract":"The Industrial Workers' Flats, located in the Batang Integrated Industrial Area, are supporting facilities workers use. The building was previously planned using conventional methods. In many cases, demands for fast and efficient construction work often occur, especially in the case of high-rise buildings. The need for multi-storey buildings encourages the need for an economical structural design that can be implemented quickly and efficiently without reducing the stiffness between the components of the building structure. From the explanation above, it is re-planned using the precast concrete method so that the work is neat, precise, and fast. In this planning, the SRPMK system is used. It needs good supervision in precast concrete, especially in joints, because precast joints are not as monolithic as conventional ones. It is necessary to develop precast technology to be more innovative in its use and easier to apply.","PeriodicalId":282199,"journal":{"name":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/cvl.v8i1.1046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Industrial Workers' Flats, located in the Batang Integrated Industrial Area, are supporting facilities workers use. The building was previously planned using conventional methods. In many cases, demands for fast and efficient construction work often occur, especially in the case of high-rise buildings. The need for multi-storey buildings encourages the need for an economical structural design that can be implemented quickly and efficiently without reducing the stiffness between the components of the building structure. From the explanation above, it is re-planned using the precast concrete method so that the work is neat, precise, and fast. In this planning, the SRPMK system is used. It needs good supervision in precast concrete, especially in joints, because precast joints are not as monolithic as conventional ones. It is necessary to develop precast technology to be more innovative in its use and easier to apply.
用预制混凝土法对巴塘1号工业公寓职工楼结构进行再设计
产业工人公寓位于巴塘综合工业区,是工人使用的配套设施。该建筑以前是用传统方法规划的。在许多情况下,对快速和高效的施工工作的需求经常出现,特别是在高层建筑的情况下。对多层建筑的需求鼓励了对经济结构设计的需求,这种设计可以在不降低建筑结构组件之间刚度的情况下快速有效地实施。从上面的解释来看,使用预制混凝土方法重新规划,使工作整齐,精确,快速。本规划使用SRPMK系统。预制混凝土需要良好的监督,特别是接缝,因为预制接缝不像传统的那样是整体的。有必要发展预制技术,使其在使用上更具创新性,更易于应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信