{"title":"Desafios na implantação de linhas de transmissão aéreas, subaquáticas e subterrâneas","authors":"R. Mansur, Í. Lopes","doi":"10.20906/sbse.v2i1.2916","DOIUrl":null,"url":null,"abstract":": This paper presents the feasibility studies and solutions to implement a transmission line with overhead, underwater and underground sections, addressing the challenges and engineering solutions to meet the minimum requirements required both by regulatory bodies and by the engineering areas of the agent of transmission, considering a minimum horizon of 30 years of operation, whose premise is the performance of the system with the mitigation of the probability of serious failures. Resumo: Este artigo apresenta os estudos de viabilidade e as soluções para implementar uma linha de transmissão com trechos aéreo, subaquático e subterrâneo abordando os desafios e as soluções de engenharia para atender aos requisitos mínimos requeridos tanto pelos entes reguladores quanto pelas áreas de engenharia do agente de transmissão, tendo em vista um horizonte mínimo de 30 anos de operação, cuja premissa é o desempenho do sistema com a mitigação da probabilidade de falhas graves.","PeriodicalId":115687,"journal":{"name":"Proceedings IX Simpósio Brasileiro de Sistemas Elétricos","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings IX Simpósio Brasileiro de Sistemas Elétricos","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20906/sbse.v2i1.2916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
: This paper presents the feasibility studies and solutions to implement a transmission line with overhead, underwater and underground sections, addressing the challenges and engineering solutions to meet the minimum requirements required both by regulatory bodies and by the engineering areas of the agent of transmission, considering a minimum horizon of 30 years of operation, whose premise is the performance of the system with the mitigation of the probability of serious failures. Resumo: Este artigo apresenta os estudos de viabilidade e as soluções para implementar uma linha de transmissão com trechos aéreo, subaquático e subterrâneo abordando os desafios e as soluções de engenharia para atender aos requisitos mínimos requeridos tanto pelos entes reguladores quanto pelas áreas de engenharia do agente de transmissão, tendo em vista um horizonte mínimo de 30 anos de operação, cuja premissa é o desempenho do sistema com a mitigação da probabilidade de falhas graves.