The fabrication and preassembly of HT-7 Superconducting Tokamak

D. Gao, J.M. Li, S.R. Wang, X. Liu, W.H. Zhu, Y. Xue, J.F. Wu, X.F. Xu
{"title":"The fabrication and preassembly of HT-7 Superconducting Tokamak","authors":"D. Gao, J.M. Li, S.R. Wang, X. Liu, W.H. Zhu, Y. Xue, J.F. Wu, X.F. Xu","doi":"10.1109/FUSION.1993.518345","DOIUrl":null,"url":null,"abstract":"The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques.","PeriodicalId":365814,"journal":{"name":"15th IEEE/NPSS Symposium. Fusion Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1993-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/NPSS Symposium. Fusion Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUSION.1993.518345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques.
HT-7超导托卡马克的研制与预装
HT-7超导托卡马克正在中国合肥建造。它是在俄罗斯T-7托卡马克的基础上改造升级而成的装置。本项目是中俄两国核聚变研究合作项目。ASIPP的研究和制造中心(RMC)负责HT-7的制造和组装。HT-7的设计在1991年由俄罗斯和中国工程师进行,并且机器的主要部件在1992年制造。HT-7的预装组装于1993年4月完成。本文着重介绍了生产HT-7所需的制造步骤和克服关键技术的一系列技术方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信