FERRORESONANCE MEASUREMENTS AND MODELING; A WAVEFORM IS WORTH A THOUSAND WORDS

Johnson Thomai
{"title":"FERRORESONANCE MEASUREMENTS AND MODELING; A WAVEFORM IS WORTH A THOUSAND WORDS","authors":"Johnson Thomai","doi":"10.23919/PCICEUROPE.2018.8491401","DOIUrl":null,"url":null,"abstract":"Over the last few decades, artificial lifting using Electrical Submersible Pumps (ESPs) became dominant in the oil and gas industry. ESP systems became essential for oil producing countries like Saudi Arabia to meet the global energy demand. Therefore, failures in such systems shall be minimized by proper upfront design. This paper describes the efforts made by the authors to address chronic failures in ESP systems. Numerous ESP transformers have failed in two of the major Saudi Aramco fields with 34.5kV networks. Power quality measurements were conducted to capture ferroresonance during single phase switching. Electromagnetic transient simulation was conducted to address similar installations without having to do the measurements at every location of concern. Mitigation solutions were recommended for existing installations as well as best design practices for new projects.","PeriodicalId":137620,"journal":{"name":"2018 Petroleum and Chemical Industry Conference Europe (PCIC Europe)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Petroleum and Chemical Industry Conference Europe (PCIC Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/PCICEUROPE.2018.8491401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Over the last few decades, artificial lifting using Electrical Submersible Pumps (ESPs) became dominant in the oil and gas industry. ESP systems became essential for oil producing countries like Saudi Arabia to meet the global energy demand. Therefore, failures in such systems shall be minimized by proper upfront design. This paper describes the efforts made by the authors to address chronic failures in ESP systems. Numerous ESP transformers have failed in two of the major Saudi Aramco fields with 34.5kV networks. Power quality measurements were conducted to capture ferroresonance during single phase switching. Electromagnetic transient simulation was conducted to address similar installations without having to do the measurements at every location of concern. Mitigation solutions were recommended for existing installations as well as best design practices for new projects.
铁共振测量和建模;一个波形胜过千言万语
在过去的几十年里,使用电潜泵(esp)进行人工举升在油气行业占据了主导地位。对于沙特阿拉伯等产油国来说,ESP系统对于满足全球能源需求至关重要。因此,这种系统的故障应通过适当的预先设计最小化。本文介绍了作者为解决ESP系统的慢性故障所做的努力。在沙特阿美公司的两个34.5kV网络主要油田中,许多ESP变压器发生了故障。在单相开关过程中进行了电能质量测量以捕获铁共振。进行电磁瞬变模拟是为了解决类似的装置,而不必在每个相关位置进行测量。针对现有设施提出了缓解方案,并针对新项目提出了最佳设计做法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信